ADDENDUM #2 World Trade Center Dust Cleaning Program Monitoring Contract Scope of Work
— Rotary metal cutting saw — For covering service openings, sheet metal plates, panels or access doors meeting NADCA 9705, NFPA 90A/90B and SMACNA specifications — Telescoping inspection mirrors and flashlights — Boroscope — HEPA vacuum
6.4 Typical system components for each equipment category
The ventilation systems may contain, but may not necessarily be limited to combinations of the listed components in each category.
6.4.1 Ventilators, wall air conditioning units and window air conditioning units in common spaces
— Outside air intake louvers, grates and screens — Outside air duct -- Outside air dampers — Return air grille — Return air plenum — Filter rack — Filter media — Coils (evaporator) — Blower assembly — Condensate drain pan — In-line electrical resistance strip heaters (in supply ducts connected to unit ventilators) — Fire dampers — Turning vanes — Supply plenum or supply duct liner — Supply air diffuser
6.4.2 Fan coil/heat pump units in common spaces
— Return grille — Return air plenum — Filter rack — Filter media — Blower assembly — Thermal coils — Supply plenum — Supply diffusers
6.4.3 Central air system
NYC-WTC 000140415
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
10 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140472
Addendum detailing all ventilation system components to be inspected and cleaned, including intake louvers, ducts, coils, blower assemblies, and duct linings at World Trade Center.
1 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140297
Addendum defining scope for cleaning World Trade Center dust from ventilation components including ducts, coils, and filters.
1 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140470
Guidelines for evaluating direct exhaust systems and identifying dust accumulation points in residential ventilation equipment.
1 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140295
Identification of ventilation system components most likely to have WTC-related dust accumulation, including air intakes, dampers, filters, and downstream components.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140298
Addendum defining inspection scope for HVAC components at World Trade Center sites to assess dust accumulation.
2 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140475
Criteria for distinguishing WTC dust from other contaminants and determining the need for cleaning or sampling.
9 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140473
Addendum specifying accessible HVAC components for inspection and methods for accessing system elements during World Trade Center dust evaluation.
2 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140300
Scope of work detailing evaluation procedures for HVAC systems to assess World Trade Center dust impact and cleaning recommendations.
9 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140291
Bibliography section listing standards from NADCA and SMACNA required for conducting World Trade Center dust evaluations in HVAC systems.
1 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140466
Document listing applicable standards like ACR 2002 and NADCA 97-05 for the assessment and cleaning of HVAC systems.
1 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140471
Addendum listing required inspection equipment and typical HVAC system components for World Trade Center dust cleaning.
1 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140471
Addendum listing required inspection equipment and typical HVAC system components for World Trade Center dust cleaning.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140296
Technical guidelines defining which ventilation components are included in the World Trade Center dust evaluation and where dust accumulation occurs.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140472
Addendum detailing all ventilation system components to be inspected and cleaned, including intake louvers, ducts, coils, blower assemblies, and duct linings at World Trade Center.
Similarity score 0.975 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140297
Addendum defining scope for cleaning World Trade Center dust from ventilation components including ducts, coils, and filters.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150329
Memorandum submitting working drafts of staging and disposal plans for World Trade Center debris at Staten Island Landfill.
Cited alongside this record in an Ask answer
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
Cited alongside this record in an Ask answer
NYC-WTC_000150251
Draft report evaluating dust generation during WTC debris sorting at Staten Island Landfill.
Cited alongside this record in an Ask answer
NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
Cited alongside this record in an Ask answer