NYC 9/11 Public Portal Document
Environmental Protection Agency Pt. 763, Subpt. E, App. B
6. If the Z-statlstlc Is less than or equal to 3. Minor repairs to damaged thermal sys
1.65, the response action is complete. If the tem Insulation which do not require re
Z-statlstic is greater than 1.65, reclean the moval.
abatement site and collect a new set of sam 4. Repairs to a piece of asbestos-containing
ples. wallboard.
5. Repairs, involving encapsulation, eqclo
[52 FR 41857, Oct. 30, 1987] sure or removal, to small amounts of friable
asbestos-containing material only if required
APPENDIX B TO Subpart E—Work in the performance of emergency or routine
Practices and Engineering Con maintenance activity and not Intended sole
trols FOR Small-Scale. Short- ly as asbestos abatement. Such work may
Duration Operations Mainte not exceed amounts greater than those
nance AND Repair (O&M) Activi which can be contained In a single prefab
ties Involving ACM ricated minienclosure. Such an enclosure
shall conform spatially and geometrically to
This appendix Is not mandatory. In that the localized work area. In order to perform
LEAs may choose to comply with all the re its Intended containment function.
quirements of 40 CFR 763.121. Section OSHA concluded that the use of certain en
763.91(b) extends the protection provided by gineering and work practice controls is capa
EPA in its 40 CFR 763.121 for worker protec ble of reducing employee exposures to asbes-
tion during asbestos abatement projects to tos to levels below
employees of local education agencies who the final standard’s action level (0,1 f/cm’).
perform smaU-scale. short-duration oper (See 51 FR 22714, Jime 20, 1986.) Several con
ations. maintenance and repair (O&M) ac trols and work practices, used either singly
tivities Involving asbestos-containing mate or in combination, can be employed effec
rials and are not covered by the OSHA asbes tively to reduce asbestos exposures during
tos construction standard at 29 CFR 1926.58 small maintenance and renovation oper
or an asbestos worker protection standard ations. These include:
adopted by a State as part of a State plan 1. Wet methods.
approved by OSHA under section 18 of the 2. Removal methods.
Occupational Safety and Health Act. Em 1. Use of glove bags.
ployers wishing to be exempt from the re li. Removal of entire asbestos insulated
quirements of §763.121 (e)(6) and {f)(2)(i) may pipes or structures.
Instead comply with the provisions of this Ui. Use of minienclosures.
3. Enclosure of asbestos materials.
appendix when performing small-scale. 4. Maintenance programs.
short-duration O&M activities. This appendix describes these controls and
Definition of Small-Scale. Short-Duration work practices in detail.
Activities Preparation of the Area Before Renovation
For the purposes of this appendix, small- or Maintenance Activities
scale. short-duration maintenance activities The first step in preparing to perform a
are tasks such as. but not limited to: small-scale, short-duration asbestos renova
1. Removal of asbestos-containing insula tion or maintenance task, regardless of the
tion on pipes. abatement method that will be used, is the
2. Removal of small quantities of asbestos- removal from the work area of all objects
containing insulation on beams or above that are movable to protect them from as
ceilings. bestos contamination. Objects that cannot
3. Replacement of an asbestos-containing be removed must be covert completely with
gasket on a valve. 6-mll-thlck polyethylene plastic sheeting be
4. Installation or removal of a small sec fore the task begins. If objects have already
tion of drywall. been contaminated, they should be thor
5. Installation of electrical conduits oughly cleaned with a High Efficiency Par
through or proximate to asbestos-containing ticulate Air (HEPA) filtered vacuum or be
materials. wet-wiped before they are removed from the
Small-scale, short-duration maintenance work area or completely encased in the plas
activities can be further defined, for the pur tic.
poses of this subpart, by the following con Wfet methods. Whenever feasible, and re
siderations: gardless of the abatement method to be used
1. Removal of small quantities of asbestos (e.g.. removal, enclosure, use of glove bags).
containing materials (ACM) only If required wet methods must be used during small-
in the performance of another maintenance scale. short-duration maintenance and ren
activity not Intended as asbestos abatement. ovation activities that involve disturbing as
2. Removal of asbestos-containing thermal bestos-containing materials. Handling asbes
system insulation not to exceed amounts tos materials wet Is one of the most reliable
greater than those which can be contained in methods of ensuring that asbestos fibers do
a single glove bag. not become airborne, and this practice
705