NYC 9/11 Public Portal Document
Environmental Protection Agency Pt. 763, Subpt. E, App. A
operations are within acceptable limits. In develop within the sampling and analysis op
this way. the quality of the data Is defined erations. A description of these quality con-
and the results are of known value. These troVquallty assurance procedures Is summa
checks and tests also provide timely and spe rized in the following Table III:
cific warning of any problems which might
TABLE III—SUMMARY OF LABORATORY DATA QUALITY OBJECTIVES
Conformance
Unit Operation Freqoengy Exneciation
Sample receiving Review of receiving report Each sample 95% complete
Sample custody Review of chain-of-custody record Each sample 95% complete
Sample preparation Supplies and reagents On receipt Meet specs, or reject
Olid opening size 20 rqieningsZK) grids/lot 100%
of 1000 or 1 openmg/sample
Special clean area monitoring After cleaning or service Meet specs or reciean
Laboratory blank 1 per prep series or 10% Meet specs, or
reanalyze series
Plasma etch blank I per 20 samples 75%
Multiple preps (3 per sample) Each sample One with cover of 15
complete grid sqs.
Sample analysis System duck Each day Each day
Alignment check Each day Each day
Magnification calibration with low and high Each moiuh or after service 95%
stsrtdsrds
ED calibration by gold standard Weekly 95%
EDS calibration by copier line Daily 95%
Performance check Laboraiory blank (measure of cleanliness) Prep 1 per series «10% Meet specs or
lead 1 per 25 samples reanalyze series
Replicate counting (measure of precisian) 1 per 100 samples IJ z Poisson Std. Dev.
Duplicate analysis (measure of reproducibility) 1 per 100 samples 2 z Poisson Std. Dev.
Known samples of typical materials Training and lor com 100%
(working standards) parison with unknowns
Analysis of MBS SRM 1876 and/or RM 8410 I per analyst per year 1J X Poisson Sid. Dev.
(measure of accuracy and comparability)
Data entry review (data validation and measure Each sample 95%
of completeness)
Record and verify ID election diffraction pauem 1 per 5 samples 80% accuracy
Of structure
Calculationsand Hand CfllCulallOT Of SUtORlStcd dstS I per 100 samples 85%
data reduction piocednre or indepezxlcnt recakulasion of bond*
calculated data
1. When the samples arrive at the labora 3. Conduct all sample preparation In a
tory. check the samples and documentation clean room environment monitored by lab
for completeness and requirements before oratory blanks. Testing with blanks must
Initiating the analysis. also be done after cleaning or servicing the
2. Check all laboratory reagents and sup room.
plies for acceptable asbestos background lev 4. Prepare multiple grids of each sample.
els.
679
NYC-WTC_000139294
OCR can misread numbers and units. Confirm readings against the page image before using them.