November 21, 2003
Mr. It. Radixaluishuwt, P.E., Director
NY City Dept of Environmental Protection
Asbestos Control Program
59-i7Junctlon Blvd. Send via fan: 718 595-3648
Flushing, NY 11373
Re: HVAC Payment D epandes
We are in receipt of your batter dated September 23,2003, In which you state that items billed
for In payment applications 22,23 and 24 (Baseboard Hems and Through the Wall HVAC
tit) are not reimbursable under the terms of the cost act.
In your lettar,•yoa make reference ton section of the contract that states: The cleaning contractor
is responsible for cleaning dances. comma space and portions of the HVAC systems
identified by the Monitoring Contractor.
Tecate Construction Inc. (TCI) has no argument with that reference or condition of the
contract. TCI agrees 100% that we are responsible under the terms of the contract for the
completion of wo* as identified in the "scope of work".
TCI disagrees with your determination that the cleaning of baseboard heaters in common spaces
is Included our base contract work The Scope of Work A for Reside tia1 Spaces specifically
identifies wider section 3.r. that: "Baseboard heater will be cleaned. Protective covers on
funned radiant heat heaters and besaboatdhanters will be removed to earpose heat elements. Fins
we to be brushed and vacuumed to remove dust." The minknetm cleaning rents for
conunon spaces makes no mention of cleaning baseboard hers. Although the cleanug of
baseboard heaters is included In the cleaning of apadtatents, at Is not Included in the cleaning
of Cosiseon Spaces. TCI negotiated unit prices for cleaning of various HVAC its,
including baseboard heatetrs. It is TCI's position that although we can be directed by the
monitoring contractor or EPA to clean baseboard heaters at common spaces, this is outside the
base scope of work and compensable under to separately negotiated unit prices.
TCI also disagrees with year detenouination that the cleating of Through the Wall 14VAC Units
In residences Is included-ii our base contract work. The Scope of Work A for Residential
Spy specl$cally Identifies under Section 3Jt. that: "Inn Wdischatge registers of HVAC
systems (Ifpresent) will be reniovedfcleanel. The first foot of duct work will also be
vacrmi red; them the registers will be reinstalled and covered with a layer of 6 mill po yctitylete
sheeting." Section 3.1. states: "Window and room * conditioners will be vacuumed, wet wiped
and removed from their housing .......Air conditioners will be reassembled and reinatadded after
cleaning." There is no mention of Through the Wd HVAC Units Included is the Scope of
Work A, Cleaning of Residential Spam Although EPA origixtaily contended that these units
were act IIVAC esks merely air conditioner, they interchanged their position so this should
not be part of this d'lstussioo. TCI negotiated tacit prices for cleaning of various HVAC
its, including Through the Wall HVAC Units. It Is TCI's position that we can be
directed by the monitoring contractor or EPA to clean Through the Wall HYAC units In
Hsizrn'dous Waste auage uestt~® Asbestos, Lead Pitlat,nMold
v Coutaia1 aced Soil * oReoi struetiou u