NYC 9/11 Public Portal Document
-gym
2.1 Central Ventilation System Visual Inspection Form Page 1 of 2
Ventilation System Identification: C..
Location: Area Served: '
6v.►'z0 fL Qj
Associatedmechanical room: clean_f Y N dry J Y stored chemicals/refuse
N YJf N
Surface Component
System Components Dust/ WPC 4 not
(TOTE: If component not present (NP), not found (NF) or inaccessible (I) please Debris Dust present
indicate In last column) Present? Present? t not
found
4
Inaccessible
Outside air intake: Location:
Accessible for inspection? Y N (explain): NP
louvers, grates and/or screens N
outside air duct N
outside air damper(s) P
Air handling unit:
outside air mixing chamber _JP
filter rack(s) N
filter media N
blower assembly incl. blower wheel, blower housing, air vanes, in-line
noise attenuators
blower housing acoustical lining N
pre-heat coils tJ
heating coils NP
cooling coils
re-heat coils
condensate drain pan
supply air plenum
supply air plenum damper(s)
vibration collars w! P
Supply air distribution: l
Supply air ducts Est. total In ft 7 No. locations inspected I
Specify type (circle): meta fibrous glass lined metal. masonry fibrous glass board S..J Al
flex-duct wood r/
Accessible in-line fire dam ers Est. total No. locations ins ected
Accessible turning vanes Est. total gty No. locations inspected n/
In-line reheat/cooline coils Est. total ty No. locations ins ected
Supply air diffusers Est. total gr No. locations inspected I Al
Return air distribution:
Return air ducts Est. total In ft K No. locations inspected
Specify type (circle): etal fibrous glass lined metal masonry fibrousglass board
flex-duct wow 7
Return air plenum Est. total RA plenum areas No.
locationsins ected T ~
Return air plenum damper Est. total qty No. locations
inspected
P
Accessible in-line fire dampers Est. total qty No. p
locationsins ected
NYC-WTC 000135915
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000135915Source: NYC Law Department, mirrored locally
An HVAC inspection report from Cole Consulting Corporation dated February 13, 2003, recommending cleaning of units at 275 Greenwich Street due to WTC dust.
An HVAC inspection report from Cole Consulting Corporation dated February 13, 2003, recommending cleaning of units at 295 Greenwich Street due to WTC dust.
EPA correspondence transmitting the final HVAC system inspection checklist and implementation guidance for use by contractors in post-9/11 building cleanup and ventilation system…