Revised Budget Estimate for HVAC Costs at 250 South End

Machine-extracted title · confidence 95%

Detailed budget estimate outlining costs for HVAC system units, risers, tents, and scaffolding at 250 South End Avenue.

NYC-WTC_000135211–000135221

Folder label: “HVAC COSTS”

Page image
Scanned page image, NYC-WTC_000135218
OCR text

OCR status: ocr · source: ours

000135218 TERMON CONSTRUCTION INC. BUDGET ESTIMATE WTC HVAC CLEANING UNIT PRICES Quad D No ITEMS 1 Tents 2 Glovebags 3 Exhaust (mushroom) fan unit(<500cfm) 4 Exhaust (mushroom) fan unit(500 - 1500cfm) 5 Exhaust (mushroom) fan unit(>1500 - 2500cfm) 6 Exhaust mushroom) fan unit(>2500cfm) 7 Exhaust Centrifugal Blower (<1000cfm) 8 Exhaust Centrifugal Blower (>1000 - 2000cfm) 9|Exhaust Centrifugal Blower (>2000cfm) 10 Exhaust Riser (Includes Cleaning Grills) 11 Exhaust Branch Riser - horizontal runs(<6 feet) 12 Exhaust Branch Riser - horizontal runs(>6 feet) 13 Air handling unit (<1000cfm) 14 Air handling unit (1000 - 2000cfm) 15 Air handling unit (>2000 - 3000cfm) 16 Package AC (< 5 Tons) 17 Package AC - each addditional 2.5 Tons 18 Mech. Make-up Air (< 1000 cfm) 19 Mech. Make-up Air (>1000 cfm) 20|Horizontal Supply/Return Duct < 5sf cross section 21 Horizontal Supply/Return Duct > 5sf cross section 22 Supply/Retur Riser < 5sf cross section 23 Supply/Return Riser > 5sf cross section 24 Encapsulation 25 Access Hatches 26 Outside Air Duct 27 Outside Air Plenum 28 Outside Air Intake Grill 29 Package HVAC - Through wall 30 Baseboard Heeting Fins 31 Scaffold Set Up TOTAL UNIT PRICE 500 Each 300 Each 300 ]Each 400 Each 500 |Each 600 Each 500 Each 750 Each 1,000 Each 200 Per Floor N/C 200 |Per 10 lin ft. increments 500 Each 750 1,000 Each Each 1,000 Each 500 |Each 600 900 200 Per 10 lin ft increments 250 Per 10 lin ft increments 200 Per Floor 250 Per Floor 150 Per 10 If/sf incriments 50 Each 200 Per 10 If incriments 5 Per sf surface area 5 Per sf 500 Each 25 Per If 100 Per 5 ft section COMPLETED EXTENSION 11,700 NYC 9/11 Public Portal Document 10,800 1€A 31 6,200 1006 1,800 100 5,030 40,630 PROJECT ADDRESS: 2 SOUTH END AVE.

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000135218Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

HVAC Cleaning Unit Price List, 2002 · Box DEP Box 56

NYC-WTC_000135243

List of building addresses and associated HVAC cleaning unit prices and total costs for the World Trade Center site.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.936

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →