HVAC inspection report, 275 Greenwich Street, Feb 2003
Machine-extracted title · confidence 95%
An HVAC inspection report from Cole Consulting Corporation dated February 13, 2003, recommending cleaning of units at 275 Greenwich Street due to WTC dust.
NYC 9/11 Public Portal Document
enrral Ventilation stent Visual Inspection Form
Ventilation System Identification
Page I f2
Location:
L ~+StS
[Associatedmechanical room: clean Served:Lo -
E;3;M tored chemicals refuse Y
System Components Surface
(NOTE: if componen t not present (\P), not found Component
(NF) or inaccessible (1) please not
indicate In last column; Debts Dust
Present' present
Present' c not
found
Outside air intake: Location:
Accessible for inspection? Y )\ (explain):
lou •ers'. crates and'or screens
1 'UP
or!side air duct
outside air dam er(s)
Air handling unit:
outside air mixitn chamber
filter rack(s)
filter m:.ji'
blower assembly Incl. blower wheel, blower
noise attenuators housing, air vanes, in -tine _--
blower housins acoustical linine
re-heat coils
heating coils
cooline coils ~ Nn
re -heat coils ry f
cottd •„csta drain
su lv air lenum
su 1 • air lenum dam er(s)
vibration collars
Supply air distribution:
S p!v air du::; Est. to:_'. It. ft 0 \.. irz:i.::_
Specify type (circle) net fibrous cls;s lined metal mss nr fi
brous cls;; board
Accessible in -line fire dampers Est. total
t.,- locations ins ected
Accessible turning vanes Est. total tr
In-tine reheat`cooling coils No. locations ins ected
Est. total t% No.
Sn - lv air diffusers locations in; ected
Est. total ry >\o.
Return air distribution: locations ins ected
Return air ducts Est. total In ft
No. locations inspected
Specify t}Fe (circle): ct: firrouc rl~,;
I •sed metal c~ ;onry fibrous class
board
1 Rersrn air pl?nt:m Est. t7:2l P r!-: :r-
1
Return air plenum damper Est. total qty Al
ins ected No. locations
Accessible in-line fire dampers Est. t;::al qty
locationsinsnecred No.
NYC-WTC 000134549
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000134549Source: NYC Law Department, mirrored locally
An HVAC inspection report from Cole Consulting Corporation dated February 13, 2003, recommending cleaning of units at 295 Greenwich Street due to WTC dust.
5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
An HVAC inspection report from Cole Consulting Corporation dated February 13, 2003, recommending cleaning of units at 295 Greenwich Street due to WTC dust.
An HVAC inspection report from Cole Consulting Corporation dated February 13, 2003, recommending cleaning of units at 295 Greenwich Street due to WTC dust.