NYC-WTC_000132911
e CTSI DAILY LOQ@ormMiINsPECTION
paren asi tnierenaaeaeacen ceed
Caneaning t taniey Gardena, tor,
,| Date: fi 0 / aD! fa Start Time. 7° 7S” Finish Time: 7 VAG
"| Technician (s) Name : pA Vee / SJ; 1o5 lya a. Technician’s License Number IY ih -~O9 (9G
Project #:
Project Client/Address: UM — iS bi toa wal
Project Location/Area 2A Feon. A al . VIET EE. fe ye (A ael,
Client Rep. (Signature): | . Client Project Manager:
Asbestos Contractor: CO a C2 Supervisor: A/C Ae VA OL YF
Project Scope of Work (i.e. Air Monitoring, Lead Sampling, Survey, IAQ, ete.):
Gel clea Cd di
Work Area Size:
ACM Quantity Removed (specify LF or SP):
Was the work area inspected by a regulatory agency/inspector (DOL, DEP, OSHA, DOH, EPA, etc.):
If yes, state the name, badge #, type of inspection & conversation.
Yes or No
1M, Beff = 18-82-3857 G0L73 3/73/02 AH 3- 00059 03702
J ALVARE2 139-973-1991 82906 Ufe3[03 Al 00-20852. j//o/
3 S2YMANSH 16-86-4279 2°78 G(I3l0t AH IB-IS290 =a 9/02
A ESPINOZA 1342-09-86 75 Be89S Bigo/y7 BUGUE-19791 12/0
oe
Cesta
°
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000132911Source: NYC Law Department, mirrored locally
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…