NYC-WTC
000132909
CTSI DAILY LOCORM/INSPECTION
Date: 9/28/01
Start Time:7:30
Finish Time: 17:30
Technician (s) Name: J, TeSLYAR /A.KOReNeViCM Technician's License Number: AL 98-09196
YPhamcibe
Project #:
Project Client/Address: //5 BROADWAY
Project Location/Area
Entiße Blalg.
Client Rep. (Signature):
Client Project Manager:
Asbestos Contractor:_
Comca
Supervisor:_
Bett Michal
Project Scope of Work (i.e. Air Monitoring, Lead Sampling, Survey, IAQ, etc.):_
Aix mon.forg
and dlea y.
Work Area Size:_
ACM Quantity Removed (specify LF or SF):_
Was the work area inspected by a regulatory agency/inspector (DOL, DEP, OSHA, DOH, EPA, etc.):
If yes, state the name, badge #, type of inspection & conversation.
Yes
or
No
Bett Michal 80213 3/3/03 AH93-00054 83/02 113-82-3854
ALvarez
Espinoza_Geovanny2806
Jerman
854658/17/03 A4 01-11008 08/02
179-32-8520
11/23/03 AH00-20852 11/07
N Jorge Brave
80107 12/29/02
139-73-1491
AM 00-02421
12/01
068-89-8828
SZYMANSKISANUSZ81278 9113102 All 98-15280 09/02
09/02 .
116-86-9279
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000132909Source: NYC Law Department, mirrored locally
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…