NYC-WTC_000132899
CTSI DAILY LoMormunsrr TION
Date. 9% ( ad, of
Start Time: “75%
Technician (s) Nam
Project #:
[%. 3e
Finish Time:
Technician’s License Number: [144 ¢ 7-O593 2,
Project Client/Addres
US heoakva,
Project Location/Area
Client Rep. (Signature
Asbestos Contractor:
Client Project Manager:
Comers Supervisor: rH. Cat
Project Scope of Work
(i.e. Air Monitoring, Lead Sampling, Survey, IAQ, etc.): Ast Vous fyreng
Len mig
Work Area Size:
Was the work area
If yes, state the nam
ACM Quantity Removed (specify LF or SF):
ected by a regulatory agency/inspector (DOL, DEP, OSHA, DOH, EPA, etc.): Yes
adge #, type of inspection & conversation.
or No
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000132899Source: NYC Law Department, mirrored locally
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…