CTSI DAILY LOG FORM/INSPECTION
Date:
9/21/01
Start Time: 7:30
Finish Time:
18:30
Techaician (s) Namo: Yury Phemolu
Technician's License Number: 4193-03781
S.Manivkav. A. Konenavich, /Oleg. Benezli ix.
Project #:
Project Client/Address:
Project Location/Area
115 Broadwor
14,05,16,1?.15, 19,20,21.
1/I Broadway
Client Rep. (Signature):
Client Project Manager:_
Asbestos Contractor:
Coueo.
Supervisor:M.Bet
Project Scope of Work (i.c. Air Monitoring, Load Sampling, Survey, IA, eto.): Az Mhomtoring
clean p
Work Area Size:_
ACM Quantity Removed (specify LF or SF):
Was the work area inspected by a regulatory agency/inspector (DOL, DEP, OSHA, DOH, EPA, etc.):
Tyes
If yes, state the name, badge #, type of inspection & conversation.
14:20
NYC DEP DMDETe MR Carlstiem Lbtchmedial.
inspeedan oro to for do DEP
all ais sanples Resultes.
SI
Comltire de Pertna Senndona, ie
No
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000132895Source: NYC Law Department, mirrored locally
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…