CTSI DAILY LOG FORM/INSPECTION
Date:
9/19/01
Start Time:
7:00
Finish Time:
Technician (s) Name : S. Uhamuka /F. Azizov/B.Shamaila Technician's License Number:_ AM 97-03833
Project #:_
Project Client/Address:
Project Location/Area
eestisane/@etirete
/ 115 Broadway
eecond: third• Farth ploor
Client Rep. (Signature):
Client Project Manager:_
Asbestos Contractor:_
M. Bet
Project Scope of Work (i.e. Air Monitoring, Iead Sampling, Survey, [AQ, oo.): Aiz Wouitoring
Work Area Size:_:
ACM Quantity Removed (specify LF or SF):_
Was the work area inspected by a regulatory agency/inspector (DOL, DEP, OSHA, DOH, EPA, etc.):
If yes, state the name, badge #, type of inspection & conversation.
Yes
No
NYC 9/11
Public Portal
Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000132889Source: NYC Law Department, mirrored locally
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…