NYC 9/11 Public Portal Document
JLC ENVIRONMENTAL CONSULTANTS, INC.
DAILY CONSTRUCTION REPORT
CLIENT: NYСДEP
PROJECT NUMBER:
03-27441-1
14 Libeety StReet, New YuRk, NY10006 PROJECT MANAGER: M.N. KHAN
TECHNICIAN: M. KELMAnsky
_SIGNATURE: Ahe
mánsky
DATE 03, 14,03
CONTRACTOR: ETS
PHASE NUMBER:_
CONSTRUCTION ACTIVITIES - NARRATIVE DESCRIPTION OF ACTIVITIES
(Enter times in and out of the work area and time of observation in applicable column)
19,00
20.00
20,30
21,30
00
23.00
24.00
00.15
01.00
01.45
02,15.
03.30
20
07.00
08.00
Aprived at site and met with iontRaçtoR SupeRViSOR
Mr. Badomsty Petep und diskussey Hhetwoek schee louk
por tonight
Egent te te wonk zrer ant ctect tadures
• Asbestos crew take time för the lunch
Asbestos crew
start to woRk
reo back on site after lunch and
Hsbestes cren start bag ot
Second asbestos crew arrived to the site with
SupeRViseR Mr Tomezyk PiotR With 10 workeRs.
Yohecked and logzet in the cont.
the contractor workers New
Bag out done of ist 100 yards truck full
aReR sign out exit project site
st asbestos crew with supeerisoR Mr. Kadomsky Peter
1s ötg ort joliet begs br elovtoe, getting Reedy
containeR.
Asbestos crew went for lunch.
Asbestos erew come back to the site and start vork
Abestos crew Bagout to another trailer.
Asbestos crew shower out and sign out
New shift asbestos crew come to the site.
My shibt come firom IL( and I exit site.