NYC 9/11 Public Portal Document
ic ---
ENVIRONMENTAL CONSULTANTS, INC
April 25, 2003
Ms. Penny Theodorellys
New York City Department ofEnvironmental Protection
59-17 Junction Boulevard, 11th Floor
Corona, NY 11368
Reference:
Dear Me. Theoderellys:
JLC Environmental Consultants, Inc. (JLC) appreciates your continued
consideration for the provision of specialized Asbestos and HAZMAT Services.
We would like you to process a request for payment for additional work. Our
original bid covered the work for a period not to exceed three weeks (see
attached addendum #2). This consideration entitled the monitoring of the
removal in that time period. However, the removal has taken longer.
Additional hours and resources were spent; as a result there was a duplication of
work. If the work had taken place in the allotted time period no additional man
hours and air monitoring tests would have been required, since the work would
have been part of the over-all project. However, the second mobilization
required the duplication of work in terms or man-hours and air monitoring tests.
These additional resources were not part of our original Lump Sum quotation.
I would like to present for your examination the following break down for the
additional mobilization;
DA's 'P rodang. Prol. Mont. Air Tech. M TEM
3126-4/6 16 hrs. 219,5 hrs. 116.5 hrs. 50 50
I have forwarded the time sheets, daily logs and air monitoring results as back-up
information for your examination. We would like to utilize for the provision of
additional services (Add-Alternate). We are requesting a change order based on
the above referenced facts for the following amount:
1212) 420.8119 e Fax: (2121 4204092
200 Park Ave South, Suite 1001 New York, New York 10003 • Tel:
tA
Vj~ l k`0iAN3 .tin I CV
NYC-WTC 000102564
OCR can misread numbers and units. Confirm readings against the page image before using them.