Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Management letter re: DEP inconsistencies, May 2002 · page 7 · Box DEP Box 36NYC-WTC_000104773
Letter to Alliance for Downtown New York regarding inconsistent DEP communications about cleaning at 44 Trinity Place.
Similarity score 0.972 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 56 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.970 (not a probability)
Illegible document fragment, HVAC Costs folder, undated · page 1 · Box DEP Box 56NYC-WTC_000135259
Unreadable text fragment from a record in the DEP Box 56 HVAC costs collection.
Similarity score 0.969 (not a probability)
OSHA air sample results chain of custody, 55 Church Street · page 19 · Box DEP Box 36NYC-WTC_000103467
Chain of custody documentation for OSHA-compliant air sampling and abatement verification at the hotel located at 55 Church Street.
Similarity score 0.969 (not a probability)
Fax transmission record, 52 Beekman Street, Oct 2002 · page 1 · Box DEP Box 47NYC-WTC_000118817
Fax transmission log page from October 29, 2002, associated with 52 Beekman Street.
Similarity score 0.968 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 242 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.968 (not a probability)