Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Air sampling correspondence, 20 Dey Street, Feb 2002 · page 146 · Box DEP Box 36NYC-WTC_000103723
Cover letter dated February 22, 2002 from LMB Inc. regarding air sampling activities at 20 Dey Street and surrounding addresses.
Similarity score 0.976 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 35 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.976 (not a probability)
OSHA air sample results chain of custody, 55 Church Street · page 131 · Box DEP Box 36NYC-WTC_000103467
Chain of custody documentation for OSHA-compliant air sampling and abatement verification at the hotel located at 55 Church Street.
Similarity score 0.976 (not a probability)
Air sample results for 55 Church Street, undated · page 120 · Box DEP Box 36NYC-WTC_000103889
Laboratory report from Testwell Laboratories presenting air sample results for the facility at 55 Church Street.
Similarity score 0.976 (not a probability)
Invoice for asbestos roof cleanup, 94 Greenwich Street, Nov 2002 · page 10 · Box DEP Box 52NYC-WTC_000128398
An invoice from Asbestos Removal Corp dated November 27, 2002, detailing roof cleanup services at 94 Greenwich Street.
Similarity score 0.975 (not a probability)
Air sampling correspondence, 20 Dey Street, Feb 2002 · page 141 · Box DEP Box 36NYC-WTC_000103723
Cover letter dated February 22, 2002 from LMB Inc. regarding air sampling activities at 20 Dey Street and surrounding addresses.
Similarity score 0.975 (not a probability)