NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 53/NO EXCHANGE PLACE 1000825, 0/0 Place AKA 27 William Street BIN# 1000825
Document / 20 pages

Asbestos removal invoice, 40 Exchange Place, Sep 2002

Machine-extracted title · confidence 95%

Invoice from Asbestos Removal Corp for roof cleanup services at 40 Exchange Place dated September 18, 2002.

NYC-WTC_000130855–000130874

Folder label: “NO EXCHANGE PLACE 1000825, 0/0 Place AKA 27 William Street BIN# 1000825

Page image
Scanned page image, NYC-WTC_000130856
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document E15OW ONG TY TEN VILL BE GETED „. КОN СY ВOРЙТИСЙ DA NYC DERARTMENT OF ENVIRONMENTAL PROTECTION Ashestos Controlf-ragrafn 59-17 Junction Boulevard, 8* Floor, Corona, NY 11368-5107 TRLM4SHMNDa Building Depl. or TRU No ASBESTOS PROJECT NOTIFICATION FOR OFFICIAL USE ONLY www.ny6.80+/dep (ASBESTOS INSPECTION REPORT) 1._ Dep (See fee schedule), When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities. This I. FACILITY 2. Address AKA 40 Exchange Place 27 William Street _ BorougManhattan zip 10004 - 3. Block _4. Lot 5. Type of Facility II. BUILDING OWNER 6. Name of Building 7. Name 8. Contact Person 9. Tel.# 10. Address III. GENERAL CONTRACTOR 11. Name_ _Fax # City _State. Zip Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name Irio Asbestos Renoval Corp. _13. Contact Person Chris Horan 14. Federal Employer ID. A PII \ 15. Tel.# 718-961-4100 Fax# 718-961-4103 16. Address 14-20 129th street _ CityCollege Point: _State NY _ Zip V. THIRD PARTY AIR MONITOR Warren & Panzer Engineers, P.C. 11356 17. Name 19. Federal Employer ID.# 21. Address_ 228 East 45th Street 18. Contact Person Michael Nolan 20. Tel.# 212-922-0077 Fax#212-922-0630 _ City New York State NY _Zip 10017 22. Sample Analysis Laboratory_Warren & Panzer Engineers _ 23. NYS DOH ELAP # 11251 VI. PROJECT INFORMATION 24. Starting date for this portion of work. 811/0= Projected completion date _ 9/30рг Asbestos work schedule Monday&Tuesday Wednesday Thursday Friday saturday2 Sunday Shift from:_ 8 Xam Dom 8 Дaт Tem If other. specify Access to inspect the premises must be provided during the work schedule indicated in this item. RECEIVED SEP 9 2002 12 25. Total amount of asbestos-containing material to be abated during this work 59,060 Square Feet, and/or Linear Feet 5200 NYC-WTC_000130856

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000130856Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →