PROJECT MONITOR LOG
_ 4.,Project #:
~; ~,1.
5._1Nruk Area(.s.G_.__..
"y.
Part 1
. ._._._._._._._._._._.,
Pu.._._~._._.V ._._.,, .
r mac.
3. Project Address:. 4a. Task #:
c- I:
8. Represent 9. Date:
6. Contractor: 7. Contractor's Foreman:
Tent-Containment Glovebagging Other
Type of Project: Full-Containmet
Large (> 160 sq. ft.. 260 tin. ft. of ACM) Small (< 160 sq. ft.. 260 tin. It.)
Size of Project: ,_
Prep Removal Cleaning
Phase of Abatement: __ Pre-abatement Sampling
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
Preparation of Work Area:
2. Ceiling Poly: Yes No
1. Construction of Decon: Yes No
No 4. Wall Poly Yes No
3. Critical Barriers (CBs): Yes
6. Floor Poly: Yes No
5. Removal to establish CBs: Yes No
No 8. Pre-cleaning: __ Yes No
7. Negative air: Yes
10. Temporary Power: Yes No
9. Prep work completed: Yes _ No
12. Prep-Inspection Passes: Yes No (Explain why)
11. Other Yes _ No
Removal: Yes (Complete 1 - 5) __ N/A
Duct Insulation Fireproofing Ceiling Tile
1. Type of ACM: Pipe Insulation
Transite Boards Floor Tile Other:
Boiler Insulation
3. Amended water used during removal: Yes No
, Yes No
2. Negative air pressure ≥ 0.02 in. of water: Yes No
Yes No 5. Proper Decon procedures followed:
4. Critical barriers intact for shift's duration:
Cleaning: Yes (Complete 1 - 6) N/A
2nd Stage 3rd Stage 2 12/12-hour waiting period after 1st cleaning:
1. 1st Stage Yes No
cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: _
3. Removal of 1st poly layer after 1st
Yes No 6. 1/12-hour waiting period after 3rd cleaning:
5. Removal of 2nd poly layer after 2nd cleaning: Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
Preparation of Work Area:
2. Pre-cleaning: Yes No
1. Construction of Tent: Yes No
4. Negative Air: Yes No N/A
3. Construction of Decon: — Yes No
6. Pref-inspection passes: Yes _ No
5. Prep work completed: — Yes No
Removal: Ceiling Tile
Pipe Insulation _ Duct Insulation Fireproofing
1. Type of ACM: Other:
Boiler Insulation Transite Boards Floor Tile _
• 2. Method or Removal:
(If Glovebag RemovaI Check 3 throwgh 8)
3. Glovebags smoke-tested:
Gross removal within tent
Yes _ No
Glovebag removal within tent (check 3 through 8)
4. Glovebags attached to smooth surface: _ Yes No
Removal included cleaning and encapsulation:__ Yes No
Yes No 6.
5. Amended water used: Yes No
Yes _ No 8. Glovebags vacuumed, double-bagged:
7. Open/damaged ends of insul. sealed:
Continued on Back Form NY-8 1