NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Asbestos - BOX 19/No folder label
Document / 336 pages

NYC-WTC_000129388

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000129388–000129723
Page image
Scanned page image, NYC-WTC_000129682
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

~m lw _PROJECT MONITOR LOG Part 1 C Work Area(s): 2. Project N~rrte~ off, 1n u _~ 1. Client: (► 3. Pro GLA dress: `/ ~~i O J '~ ~'C~Cc : •~ { _ E9.De: 8. ATC Representative: 7. Contractor's Foreman: Y. oZ 6. Contractor: t .f r G -n t! e trua,.o vc

Glovebagging Other Tent-Containment Full-Containment Type of Project: sq. ft.. 260 tin. ft.) of ACM) —._ — Small (< 160 --- Large (> 160 sq. ft.. 260 tin. ft. Size of Project: Removal Cleaning Pre-abatement Sampling Prep Phase of Abatement: —_ Waste Load-out Finals Encapsulation

ABATEMENT FULL-CONTAINMENT

section): Work Area Location (floor, room. performed in 1 - 10) N/A (If already completed) Preparation of Work Area: _ Yes (Indicate prep work - Yes No No 2. Ceiling Poly: Yes Yes _— No 1. Construction of Decon: 4. Wall Poly: Yes No — Yes No 3. Critical Barriers (CBs)' No 6. Floor Poly: Yes Yes No 5. Removal to establish CBs —— --

No 8. Pre-cleaning: Yes _ Yes No 7. Negative air: --- 10. Temporary Power: Yes No Yes No (Explain why) I 1 Prep work completed: 12. Prep-Inspection Passes: -- -- 11.Other _ __ Yes -- No

Yes (Complete I - 5) __. N/A Removal: Ceiling Tile Duct Insulation fireproofing Pipe Insulation Floor Tile Other: 1. Type of ACM: Transite Boards Boiler Insulation removal: Yes No Yes __ No 3. Amended water used during — Yes No 2. Negative air pressure ≥ 0.02 in. of water: -- No 5. Proper Decon procedures followed: Yes 4. Critical barriers intact for shift's duration: —_ -- N/A Yes (Complete I - 6) Cleaning: cleaning, 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st Yes No 1. 1st Stage No 4 4/12-hour waiting period after 2nd cleaning: Yes after 3rd cleaning: 3. Removal of 1st poly layer after 1st cleaning: — Yes No 6 1/12-hour waiting period Yes No 5. Removal of 2nd poly layer after 2nd cleaning:

ABATEMENT TENT-CONTAINMENT

section): Work Area Location (floor, room, performed in I - 6) N/A (If already completed) Preparation of Work Area: Yes (Indicate prep work

Yes _ No No 2. Pre cleaning: N/A Yes Yes _No 1. Construction of Tent: 4. Negative Air: Yes No No 3. Construction of Decon: 6. Pref-inspection passes: Yes Yes _No 5. Prep work completed: Ceiling Tile Removal: Duct Insulation FireProofin9 Pipe Insulation Floor Tile Other: 1. Type of ACM: Transite Boards Boiler Insulation Glovebag removal within tent (check 3 through 8)

• 2. Method or Removal:

(If Glovebag Removal Check 3 3. Glovebags smoke-tested: through 8) Gross removal within tent

Yes No No 4. Glovebags attached to smooth 6. Removal included cleaning and surface: encapsulation: Yes No No Yes Yes No 5. Amended water used: Yes No 8. Glovebags vacuumed. double-bagged: 7. Open/damaged ends of insul. sealed: Form NY-8 Continued on Back

NYC-WTC 000129682

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000129682Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →