NYC 9/11 Public Portal Document
~m lw _PROJECT MONITOR LOG
Part 1
C Work Area(s):
2. Project N~rrte~ off, 1n u _~
1. Client:
(► 3. Pro GLA dress: `/ ~~i O J '~
~'C~Cc : •~ { _ E9.De:
8. ATC Representative:
7. Contractor's Foreman:
Y. oZ
6. Contractor: t .f r G -n
t! e trua,.o vc
Glovebagging Other
Tent-Containment
Full-Containment
Type of Project: sq. ft.. 260 tin. ft.)
of ACM) —._ — Small (< 160
--- Large (> 160 sq. ft.. 260 tin. ft.
Size of Project: Removal Cleaning
Pre-abatement Sampling Prep
Phase of Abatement: —_
Waste Load-out Finals
Encapsulation
ABATEMENT
FULL-CONTAINMENT
section):
Work Area Location (floor, room.
performed in 1 - 10) N/A (If already completed)
Preparation of Work Area: _ Yes (Indicate prep work
- Yes No
No 2. Ceiling Poly:
Yes Yes _— No
1. Construction of Decon: 4. Wall Poly:
Yes No — Yes No
3. Critical Barriers (CBs)' No 6. Floor Poly:
Yes Yes No
5. Removal to establish CBs ——
--
No 8. Pre-cleaning:
Yes _ Yes No
7. Negative air: --- 10. Temporary Power:
Yes No Yes No (Explain why)
I 1 Prep work completed: 12. Prep-Inspection Passes: -- --
11.Other _ __ Yes -- No
Yes (Complete I - 5) __. N/A
Removal: Ceiling Tile
Duct Insulation fireproofing
Pipe Insulation Floor Tile Other:
1. Type of ACM: Transite Boards
Boiler Insulation
removal: Yes No
Yes __ No 3. Amended water used during —
Yes No
2. Negative air pressure ≥ 0.02 in. of water: --
No 5. Proper Decon procedures followed:
Yes
4. Critical barriers intact for shift's duration: —_
-- N/A
Yes (Complete I - 6)
Cleaning: cleaning,
2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st Yes No
1. 1st Stage No 4 4/12-hour waiting period after 2nd cleaning:
Yes
after 3rd cleaning:
3. Removal of 1st poly layer after 1st cleaning: —
Yes No 6 1/12-hour waiting period Yes No
5. Removal of 2nd poly layer after 2nd cleaning:
ABATEMENT
TENT-CONTAINMENT
section):
Work Area Location (floor, room,
performed in I - 6) N/A (If already completed)
Preparation of Work Area: Yes (Indicate prep work
Yes _ No
No 2. Pre cleaning: N/A
Yes Yes _No
1. Construction of Tent: 4. Negative Air:
Yes No No
3. Construction of Decon: 6. Pref-inspection passes:
Yes
Yes _No
5. Prep work completed:
Ceiling Tile
Removal: Duct Insulation FireProofin9
Pipe Insulation Floor Tile Other:
1. Type of ACM: Transite Boards
Boiler Insulation Glovebag removal within tent (check 3 through 8)
• 2. Method or Removal:
(If Glovebag Removal Check 3
3. Glovebags smoke-tested:
through 8)
Gross removal within tent
Yes No
No
4. Glovebags attached to smooth
6. Removal included cleaning and
surface:
encapsulation:
Yes No
No
Yes Yes No
5. Amended water used: Yes No 8. Glovebags vacuumed. double-bagged:
7. Open/damaged ends of insul. sealed: Form NY-8
Continued on Back
NYC-WTC 000129682