NYC 9/11 Public Portal Document
NATs
1. Client: 2. Project Name:
PROJECT MONITOR LOG
4. Project #: 5. Work Area(s):
Part 1
• 6. Contractor:
—> 3. Project Address:
7. Contractor's Foreman:
4a. Task #:
8. 7TCepresentative:
/
9. Date:
1 yc. < / C)i t _l 2_ _ _L ; -/ - . j
Type of Project: Full-Containment Tent-Containment __ Glovebagging Other
Size of Project: __ Large (> 160 sq. ft.. 260 lin. ft. of ACM) Small (< 160 sq. ft., 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in I - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Poly: __ Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes No 8. Pre-cleaning: Yes __ No
9. Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure > 0.02 in. of water Yes -- No 3. Amended water used during removal Yes No
4. Critical barriers intact for shift's duration: __ Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1st Stage 2nd Stage 3rd Stage 2 12/12-hour waiting period after 1st cleaning•
3. Removal of 1st poly layer after 1st cleaning: Yes No 4 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) — N/A (If already completed)
1. Construction of Tent: Yes No 2, Pre-cleaning: Yes No
3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A
5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal:
1. Type of ACM: Pipe Insulation Duct Insulation _ Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
!I 2. Method or Removal:
(If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested:
5. Amended water used:
Gross removal within tent
Yes
__ Yes
No
No
Glovebag removal within tent (check 3 through 8)
4. Glovebags attached to smooth surface:
6. Removal included cleaning and encapsulation
Yes
Yes
No
No
7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1
NYC-WTC 000129664
OCR can misread numbers and units. Confirm readings against the page image before using them.