PROJECT MONITOR LOG Part 1
1. Client: 2. Pr~*e t a ~j 4. Project #: 5. Work Area(s):
• 3-P o CLA es :sn
C K'~ in - ~~ 15 - 2 2 3 ^ - GCo
C e'd~'r cY
c+ 1
r✓
4a. Task #'
c o0 /~` L
6. Contractor:
-
c ,-,-;c ,
~rck
7. Contractor's Foreman:
4. Ci
18. ATC Representative:
E. L 0,- e 9. Date:
Type of Project: __ Full-Containment Tent-Containment Gloveoagging Other
Size of Project: __ Large (> 160 sq. ft.. 260 tin. ft. of ACM) Small 1< 160 sq. ft.. 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Loao-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Pdly: __ Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes No 8. Pre-cleaning: Yes No
9. Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
• Removal:
1. Type of ACM:
Yes (Complete 1 - 5)
Pipe Insulation
Boiler Insulation
Duct Insulation
Transite Boards
N/A
Fireproofing
Floor Tile
Ceiling Tile
Other:
2. Negative air pressure ≥ 0.02 in. of water: _ Yes No 3. Amended water used during removal: Yes No
4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. _ 1st Stage 2nd Stage 3rd Stage 2 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes - No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A
5. Prep work completed' Yes No 6. Pref-inspection passes: Yes No
Removal:
1. Type of ACM: Pipe Insulation Duct Insulation _ Fireproofing Ceiling Tile
Boiler Insulation Transite Boards _ Floor Tile Other:
• 2. Method or Removal.
(if Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested:
Gross removal within tent
Yes No
_ Glovebag removal within tent (check 3 through 8)
4. Glovebags attached to smooth surface: Yes No
5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No
7. Open/damaged ends of insul. sealed' Yes No 8. Glovebags vacuumed, double-bagged: Yes No