NYC 9/11 Public Portal Document
?ATC
1. Client: 2. Pro ct N
PROJECT MONITOR LOG
/1 4. Pro)e # 5. Work Area(s):
Part 1
eC~lE~
~^
3jyject P~dres~ !-rp
.rt 4a. Task #: C /f ~i re
Contractor's__
'
C/
6. Contractor: 7. Foreman: 8. ATC Representative: 9. Date:
Type of Project: __ Full-Containment Tent-Containment __ Glovebagging Other
Size of Project: __ Large (> 160 sq. ft.. 260 fin. ft. of ACM) Small (< 160 sq. ft.. 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) _ N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes No 8. Pre-cleaning: Yes No
9. Prep work completed: Yes No 10. Temporary Power: Yes _ No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
• 1. Type of ACM: Pipe Insulation
Boiler Insulation
— Duct Insulation
Transite Boards
Fireproofing
Floor Tile
Ceiling Tile
Other:
2. Negative air pressure > 0.02 in. of water: Yes _ No 3. Amended water used during removal: Yes No
4. Critical barriers intact for shift's duration: Yes _ No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes _ No 4 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes _ No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: Yes No 4. Negative Air: Yes No _ N/A
5. Prep work completed: Yes No 6. Prof-inspection passes: Yes No
Removal:
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
• (If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No
5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No
7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-
NYC-WTC 000129410
OCR can misread numbers and units. Confirm readings against the page image before using them.