PROJECT MONITOR LOG Part 1
1. Client: 2. Pro ect Name: 4. Project #: 55. Wor
~tQ®___,
3. Pro ect Addres 4a. Task #:
•_./2L2 ntractor:
1
7. Contractor's Foreman:
G Lt
8. ATC Representative: 9. Date:
Type of Project: _~. Full-Containmen Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft.. 260 tin. ft. of ACM) Small (< 160 sq. ft., 260 tin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes _ No 8. Pre-cleaning: Yes __ No
9. Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete I - 5) __ N/A
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile _ Other:
2. Negative air pressure > 0.02 in. of water ___ Yes __ No 3. Amended water used during removal • _ Yes No
4. Critical barriers intact for shift's duration: _ Yes _ No 5. Proper Decon procedures followed: — Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning•
3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes _ No
5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: _ Yes (Indicate prep work performed in I - 6) N/A (If already completed)
1. Construction of Tent: _ Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: _ Yes No 4. Negative Air: Yes No N/A
5. Prep work completed: _ Yes No 6. Pref-inspection passes: Yes No
Removal:
1. Type of ACM _ Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
- Boiler Insulation Transite Boards Floor Tile Other:
• 2. Method or Removal:
(If Glovebag Removal Check 3 through 8)
Gross removal within tent Glovebag removal within tent (check 3 through 8)
Yes No
3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface:
5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No
7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1/01