NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Asbestos - BOX 19/No folder label
Document / 336 pages

NYC-WTC_000129388

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000129388–000129723
Page image
Scanned page image, NYC-WTC_000129408
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part 1 J ('RTc PROJECT MONITOR LOG „s 5. Work Area(s):

N .ssec. Name i 1 Client. 4a. Task #: O ^~ L JT1( ( )rs 3. Project ddre 9. Date: 8. ATC Representative. 7. Contractor's oreman 6. Contractor:

Glovebagging Other Full-Containment Tent-Containment Type of Project: Small (< 160 sq. It.. 260 lin. ft.) Large t> 160 sq. ft.. 260 lin. ft. of ACM) _ Size of Project: Cleaning Removal Prep Phase of Abatement: Pre-abatement Sampling Waste Load-out Finals Encapsulation

ABATEMENT FULL-CONTAINMENT

section): Work Area Location (floor, room, I - 10) N/A (If already completed) Preparation of Work Area: Yes (Indicate prep work performed in Yes No Yes No 2. Ceiling Poly: 1. Construction of Decon: 4. Wall Poly: -- Yes — No Yes No No 3. Critical Barriers (CBs): 6. Floor Poly. Yes Yes No No 5. Removal to establish CBs: 8. Pre-cleanign : Yes 7. Negative air: Yes _ No Yes No -

No 10. Temporary Power: Yes Yes — No (Explain why) 9. Prep work completed: No 12. Prep-Inspection Passes: 11. Other — Yes N/A Removal: —Yes (Complete 1 - 5) Fireproofing Ceiling Tile Pipe Insulation Duct Insulation 1. Type of ACM: Floor Tile Other: Boiler Insulation Transite Boards removal: Yes No Yes No 3. Amended water used during of water: No 2. Negative air pressure > 0.02 in. No 5. Proper Decon procedures followed: Yes shift's duration: Yes 4. Critical barriers intact for N/A Yes (Complete 1 -6) Cleaning: after 1st cleaning: 3rd Stage 2. 12/12-hour waiting period Yes No 1. 1st Stage 2nd Stage after 2nd cleaning: Yes No 4 4/12-hour waiting period 3. Removal of 1st poly layer after 1st cleaning: period after 3rd cleaning: Yes No 6. 1/12 hour waiting after 2nd cleaning: Yes No 5. Removal of 2nd poly layer

TENT-CONTAINMENT ABATEMENT

section): Work Area Location (floor, room. in 1 - 6) N/A (If already completed) Preparation of Work Area: Yes (Indicate prep work performed

Yes _ No Yes No 2. Pre-cleaning: N/A 1. Construction of Tent: 4. Negative Air: Yes No Yes No 3. Construction of Decon: 6. Pref-inspection passes: Yes - No Yes _No 5. Prep work completed:

Removal: Fireproofing Ceiling Tile Pipe Insulation Duct Insulation 1. Type of ACM: Floor Tile Other: Boiler Insulation Transite Boards through 8) Glovebag removal within tent (check 3 Gross removal within tent 2. Method or Removal: through 8) No (If Glovebag Removal Check 3 No 4. Glovebags attached to smooth surface: Yes Yes Yes No 3. Glovebags smoke-tested: encapsulation: Yes No 6. Removal included cleaning and 5. Amended water used: Yes No Yes No 8. Glovebags vacuumed, double-bagged: 7. Open/damaged ends of insul. sealed: Form NY- Continued on Back

NYC-WTC 000129408

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000129408Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →