NYC 9/11 Public Portal Document
Part 1
J ('RTc PROJECT MONITOR LOG
„s 5. Work Area(s):
N
.ssec.
Name
i 1 Client.
4a. Task #: O ^~ L JT1( ( )rs
3. Project ddre
9. Date:
8. ATC Representative.
7. Contractor's oreman
6. Contractor:
Glovebagging Other
Full-Containment Tent-Containment
Type of Project:
Small (< 160 sq. It.. 260 lin. ft.)
Large t> 160 sq. ft.. 260 lin. ft. of ACM) _
Size of Project: Cleaning
Removal
Prep
Phase of Abatement: Pre-abatement Sampling
Waste Load-out Finals
Encapsulation
ABATEMENT
FULL-CONTAINMENT
section):
Work Area Location (floor, room,
I - 10) N/A (If already completed)
Preparation of Work Area: Yes (Indicate prep work performed in
Yes No
Yes No 2. Ceiling Poly:
1. Construction of Decon: 4. Wall Poly: -- Yes — No
Yes No No
3. Critical Barriers (CBs): 6. Floor Poly. Yes
Yes No No
5. Removal to establish CBs: 8. Pre-cleanign : Yes
7. Negative air: Yes _ No Yes No
-
No 10. Temporary Power:
Yes Yes — No (Explain why)
9. Prep work completed: No 12. Prep-Inspection Passes:
11. Other — Yes
N/A
Removal: —Yes (Complete 1 - 5)
Fireproofing Ceiling Tile
Pipe Insulation Duct Insulation
1. Type of ACM: Floor Tile Other:
Boiler Insulation Transite Boards
removal: Yes No
Yes No 3. Amended water used during
of water: No
2. Negative air pressure > 0.02 in. No 5. Proper Decon procedures followed:
Yes
shift's duration: Yes
4. Critical barriers intact for
N/A
Yes (Complete 1 -6)
Cleaning:
after 1st cleaning:
3rd Stage 2. 12/12-hour waiting period Yes No
1. 1st Stage 2nd Stage after 2nd cleaning:
Yes No 4 4/12-hour waiting period
3. Removal of 1st poly layer after 1st cleaning: period after 3rd cleaning:
Yes No 6. 1/12 hour waiting
after 2nd cleaning: Yes No
5. Removal of 2nd poly layer
TENT-CONTAINMENT ABATEMENT
section):
Work Area Location (floor, room.
in 1 - 6) N/A (If already completed)
Preparation of Work Area: Yes (Indicate prep work performed
Yes _ No
Yes No 2. Pre-cleaning: N/A
1. Construction of Tent: 4. Negative Air: Yes No
Yes No
3. Construction of Decon: 6. Pref-inspection passes:
Yes - No
Yes _No
5. Prep work completed:
Removal: Fireproofing Ceiling Tile
Pipe Insulation Duct Insulation
1. Type of ACM: Floor Tile Other:
Boiler Insulation Transite Boards
through 8)
Glovebag removal within tent (check 3
Gross removal within tent
2. Method or Removal:
through 8) No
(If Glovebag Removal Check 3 No 4. Glovebags attached to smooth surface:
Yes
Yes Yes No
3. Glovebags smoke-tested: encapsulation:
Yes No 6. Removal included cleaning and
5. Amended water used: Yes No
Yes No 8. Glovebags vacuumed, double-bagged:
7. Open/damaged ends of insul. sealed:
Form NY-
Continued on Back
NYC-WTC 000129408
OCR can misread numbers and units. Confirm readings against the page image before using them.