PROJECT MONITOR LOG Part 1
1 Client oje t Na 4 Proj cl #: 5. Work Area1,~Y r
3. Proje~Ad ess: 4a. Task #
6. Contra or: 7. Contractor's Foreman: 8. A Representative: 9. Date:
Type of Project: __ Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft., 260 tin. ft. of ACM) _.._._ Small (< 160 sq. ft., 260 lin. ft.)
Phase of Abatement: __ Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
/ 5 l T-/ L
,,`G~
Work Area Location (floor, room, section): (q n
Preparation of Work Area: ,/Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes -- No 4. Wall Poly: Yes t/ No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes d No
7. Negative air: Yes No 8. Pre-cleaning: y Yes No
9. Prep work completed: Yes No 10. Temporary Power: // Yes No
11. Other Yes No 12. Prep-inspection Passes: _,L Yes __ No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
/~
Boiler Insulation Transite Boards Floor Tile Other: (2le)%1/~ (;,L
2. Negative air pressure ≥ 0.02 in. of water: Yes No 3. Amended water used during removal: _ Yes No
4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: _ Yes (Complete 1 -6) N/A
1. 1st Stage 2nd Stage ___ 3rd Stage 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: Yes No . Negative Air: Yes No N/A
5. Prep work completed: Yes No ref-inspection passes: _ Yes No
Removal:
1. Type of ACM: Pipe Insulation ' Duct Insulation Fireproofing — Ceiling Tile
Boiler Insulation.-•- Transite Boards Floor Tile _ Other:
2. Method or Removal: Gross remodel within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through
3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No
5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No
7. Open/damaged ends of insul. sealed: Yes _ No 8. Glovebags vacuumed. double-bagged: Yes No
Continued on Back Form NY-8 1/01