NYC 9/11 Public Portal Document
eATc
1. Client: 2. Proj_ t e
PROJECT MONITOR LOG
c.
4. Project #:
> ~.~ Cr
✓ , 5. Work Area(s):
Part 1
~~~>l
/- 3. Prr ect-Addr,ess: ; 4a. Task # y~ / (i
6. Contractor: 7. Contractor's Foreman: 8. ATC Representative: 9. Date:
(/I ;: :' . Z c~.
Type of Project: Full-Containment Tent-Containment Glovebagging Other _
Size of Project: __ Large (> 160 sq. ft., 260lin. ft. of ACM) Small (< 160 sq. ft.,260 un. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes __ No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes No 8. Pre-cleaning: Yes No
9. Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: _— Yes (Complete 1 - 5) N/A
•I 1. Type of ACM: Pipe Insulation
Boiler Insulation
2. Negative air pressure ≥ 0.02 in. of water:
4. Critical barriers intact for shift's duration:
Yes
Yes
—
_
Duct Insulation
Transite Boards
No
No
Fireproofing
Floor Tile
3. Amended water used during removal:
5. Proper Decon procedures followed:
Ceiling Tile
Other:
__ Yes
Yes
No
No
Cleaning: Yes (Complete 1 - 6) N/A
1. _ 1st Stage 2nd Stage 3rd Stage 2 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4 4/12-hour waiting period after 2nd cleaning. Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes — No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: _ Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A
5. Prep work completed: _ Yes No 6. Prof-inspection passes: Yes No
Removal:
1. Type of ACM: _ Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No
5. Amended water used, Yes No 6. Removal included cleaning and encapsulation: Yes No
7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1/01