PROJECT MONITOR LOG Part 1
1. Client- 2. Project Name: 4. Pro ect #: 5. Work Area(s):
c i eGv, - u 13 -;E190
I
co• p
o
p
c f' 3. Project pa,ddre s: 4a. Task #:
f
Ar-Ow v d •bu i •1~~rAi v~~
t ' Cec~ s1f ^~ y i -
. Contractor: AC i~iOv. 7. Contractor's Foreman: 18. ATC Representative' 9. Date:
66.c
Gv.v;rcv~vMe..~a~ ls"rot. _
' 'SQ '.
Lew, .,. v;~ j1
e s iCs.
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq. ft., 260 tin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes No 8. Pre-cleaning: Yes No
9. Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: __ Yes (Complete I - 5) N/A
• 1. Type of ACM: _ Pipe Insulation
Boiler Insulation
2. Negative air pressure > 0.02 in. of water: __ Yes -_
Duct Insulation
Transite Boards
No
Fireproofing
Floor Tile
3. Amended water used during removal:
Ceiling Tile
Other:
Yes No
4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: Yes No 4. Negative Air: Yes No _ N/A
5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal:
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
• (If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested:
5. Amended water used:
Yes
Yes
No
No
4. Glovebags attached to smooth surface:
6. Removal included cleaning and encapsulation:
Yes
Yes
No
No
7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1