PROJECT MONITOR LOG Part 1
1. Client 2. Project Name: .. 4. Project #: 5. Work Area(s):
r -c -" j,.,2/ C.J- t
3. Project Address: 4a. Task #-
C,ri i'1C11_
6. Contractor: 7. Contractor's Foreman: 8. ATC Representative: 9. Date:
Type of Project: _ - - F'ull-Containment Tent-Containment Glovebagging Other _
Size of Project: Large (> 160 sq. ft., 260 tin. ft. of ACM) __Small (< 160 sq. ft.. 260 lin. ft.)
Phase of Abatement: __ Pre-abatement Sampling Prep Removal . -Gleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes _ No
7. Negative air: Yes No 8. Pre-cleaning: Yes No
9. Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other Yes No 12. Prep-Inspection Passes: Yes _ No (Explain why)
Removal: Yes (Complete 1 5) N/A
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards- - Floor Tile Other:
2. Negative air pressure > 0.02 in. of water: Y s __ No 3. Amended water used during removal: Yes No
4. Critical barriers intact for shift's duration: es __ No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Comp to 1 - 6) N/A
1 1st Stage 2nd Stage 3rd Stag 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: J Yes No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: _ Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A
5. Prep work completed: Yes No 1 6. Pref-inspection passes: Yes No
Removal: 1 -~ `J
1. Type of ACM: Pipe Insulation . ' Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation -' Transite Boards Floor Tile Other:
2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No
5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No
7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1/01
NYC-WTC 000129520