NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Asbestos - BOX 19/No folder label
Document / 336 pages

NYC-WTC_000129388

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000129388–000129723
Page image
Scanned page image, NYC-WTC_000129508
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• S S O G , ,/ 5 , N C PROJECT MONITOR LOG Part 1 1. Client: 2. Project Name: . 4. Project if: 5. Work Area(s):

3. Project Addr ss: 4a. Task fir •

6. Contractor: 7. Contractor's Foreman: 8. ATC sentative: 9.

• Date:

Type of Project: Full-Containment Tent-Containment Glovebagging Other

Size of Project: Large (> 160 sq. ft., 260 fin. ft. of ACM) Small (< 160 sq. ft., 260 tin. ft.)

Phase of Abatement: Pre-abatement Sampling Prep Removal - -Cleaning

Encapsulation Waste Load-out Finals

FULL-CONTAINMENT ABATEMENT

Work Area Location (floor, room, section):

Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (if already completed)

1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): Ye' No 4. Wall Poly: __ Yes No 5. Removal to establish CBs: Ye No 6. Floor Poly: } Yes No 7. Negative air: Ye No 8. Pre-cleaning: __ Yes No 9. Prep work completed: Ye No 10. Temporary Power: Yes No 11. Other Ye No 12. Prep-Inspection Passef: __ Yes No (Explain why)

Removal: Y s (Complete 1 - 5) N/A

1. Type of ACM: Pipe Insulati Duct Insulation Firep oofing Ceiling Tile Boiler Insula on Transite Boards Flool Tile Other:

2. Negative air pressure > 0.02 in. of wa er: -- Yes No 3. Amended water u ed during removal: Yes No 4. Critical barriers intact for shift's durati n: Yes No 5. Proper Decon procedures followed: Yes No

Cleaning: Yes (Complete 1 - 6) N/A

1. 1st Stage 2nd Stage 3rd Stage 2 12/12-hour waiting period after 1st cleaning: 3. Removal of 1st poly layer after 1st clea ing: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd clea ' g: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No

TENT-CONTAINMENT ABATEMENT

Work Area Location (floor, room, section):

Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)

1. Construction of Tent: Yes lo 2. Pre-cleaning: Yes No 3. Construction of Decon: Yes o 4. Negative Air: Yes No N/A 5. Prep work completed: Yes o 6. Pref-inspecti n passes: Yes No

Removal: 1. Type of ACM: Pipe Insul ion Duct Insulati Fireproofing Ceiling Tile Boiler Ins lation Transite Boa s Floor Tile Other: 2. Method or Removal: Gross removal within tent _ Glovebag removal within tent (check 3 through 8) (If Glovebag Removal Check 3 through 8)

• / 3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No 5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No 7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No

Continued on Back Form NY-8 1/01

NYC-WTC 000129508

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000129508Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →