( TC PROJECT MONITOR LOG
5. Work Area(s):
Part 1
1. Client: 2. Pr ject Name:
ce t; .J ¢
3. Proj~ct,Ai reds,,
4. Project #:
4a. Task
OOO
JT 0000 -L
7. Contractor's Foreman: 8. ATC Representative: 9. Date:
6. Contractor:
A C4
Cro -, A. . .c, • o vie
Type of Project: __ Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft.. 260 tin. ft. of ACM) Small (< 160 sq. ft.. 260 lin. ft.)
Phase of Abatement: __ Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes _ No
7. Negative air: Yes No 8. Pre-cleaning: Yes _ No
9. Prep work completed: Yes No 10. Temporary Power: Yes _ No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure > 0.02 in. of water: _ Yes - No 3. Amended water used during removal: Yes No
4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete I - 6) N/A
1. 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: — Yes No 4 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: — Yes No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area. Yes (Indicate prep work performed in 1 - 6) _ N/A (If already completed)
1. Construction of Teht: - Yes No __ - 2. Pre-cleaning: Yes - No
3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A
5. Prep work complete -- . Yes - No 6. Pref-inspection passes: s , - No
Removal -~~ - -
Pipe InJ Ration Duct Insulation :_~-^: - FireproeFi Ceiling Tile
—" . 8oifer Insulation ?rary5k 6 o6r Tile -- Other:
~~Wa~~®r Removal Gross removal within tent Glovebag removat within tent (check 3 through 8)
S (If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested:
5. Amended waterused: ,-
Yes ~111Ci
Yes "~'`~~do
4. oi/eags attached to smooth surf ce:
r
-6 Removal included cleaninaad
9 encapsulation
~
.encaP
Yes
Yes
No
No
7. Open/damaged ends of ins). sealed: Yes-'' 1 No 8. Glovebags vacuumed, douple:bagged: Yes No
Continued on Back Form NY-8 1/01