NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/70 FULTON STREET 1001184, 76/28
Document / 12 pages

Invoice for roof work, 70 Fulton Street, undated

Machine-extracted title · confidence 90%

Invoice from Son Control Inc. for roof work at 70 Fulton Street.

NYC-WTC_000129323–000129334

Folder label: “70 FULTON STREET 1001184, 76/28

Page image
Scanned page image, NYC-WTC_000129324
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbesto% tEqI Program 59-17 Junction Boulevard, 8 Floor, Corona, NY 11368-5107 Building Dept. or TRU No FOR OFFICIAL USE ONLY ONLY ~s /' EN ~ nupd4e'~co a ASBESTOS PROJECT NOTIFICATION 44/ILL BE (ASBESTOS INSPECTION REPORT) 1. iEPTE/) !wv.nyi.sorJear . schedule)

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original requires one copy of the form with original signatures. This signatures are required. Submittal at the NYCDEP abatement activities. form must be submitted to the NYC DEP not less than one week In advance of the start of

1. FACILITY S*Mr--ET Borough _(MS Zip 10038 2. Address — O Fti%_T ON 3. Block 7'e 4. Lot 28 AKA

5. Type of Facility MIXED c>ss` 6. Name of Building

II. BUILDING OWNER

7. Name --___- • ' 8. Contact Person

9. Tel # Fax # City State ____ Zip 10. Address

III. GENERAL CONTRACTOR Tel. # 11. Name__—__--_____________

IV. ASBESTOS ABATEMENT CONTRACTOR SorJ Cary M T 20 f u E• ____13. Contact Person L IE IArhN tCo -- 12. Name 3E*iJAavll at kogz8A 1

P11 _ 15. Tel. # c-It8) 53i_? _—_ Fax # ~"th8~_~9~ 14. Federal Employer ID. # Av u'~ City State L. Zip --U236 —_ 16. Address 1248 P-A-F%k

V. THIRD PARTY AIR MONITOR

17. Name _ v) RRREis $ P_h_ _N_ _ _ _e.- s to 5 18. Contact Person _J_

PI I 20. Tel. # __ Fax # (712) 19. Federal Employer ID. 4S s•t I"LT City 0 Y State .L Zip _toot-r; _._._ 21. Address _22h3 AST

M 23. NYS DOH ELAP # 22. Sample Analysis Laboratory—

VI. PROJECT INFORMATION 1 24. Starting date for this portion of work _ '`' t124 (2 ._ Projected completion date i'o 1?A 102.

I Friday ® Sat rrda Suniay. Asbestos work schedule ® Monday 13 Tuesday ® Wednesday IN Thursday

Shift from: B ® am 0 pm to 0,°6 ❑ am ® pm

If other, specify --- Access to Inspect the premises must be provided during the work schedule indicated in this item.

25. Total amount of asbestos-containing material to be abated during this work 1 34. Square Feet, and/or v Linear Feet

p`;RErUnv ~e p 4r: raq~M' ~t "£ht

NYC-WTC 000129324

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000129324Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →