NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/No folder label
Document / 5 pages

Asbestos project notification form, DEP, 2002

Machine-extracted title · confidence 95%

DEP form requiring submission of asbestos inspection reports and emergency details prior to abatement activities.

NYC-WTC_000129034–000129038
Page image
Scanned page image, NYC-WTC_000129037
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document teas TDeeeroe 311678 7213 Ts: AaR~o~ rMC5 unr a►1era1 Ti1W 1107«70 YM Pip Z erg

DONOHOE ENVIRONMENTAL, INC 39Bowery #684 New York, New York 10002 Phone: 212 260-9818 Fax: 212 673-7215

April 18, 2002

Ms. Carl Lutelunediial N.Y.C. D.fi.P., Asbestos Control Program 59-17 Junction Blvd, 8th Floor Queens,NY 11368-5107

Re: Proposed Scope of Work In the elevator shaft, on the entrance landing and roof at 150 Franklin Strut, NYC.

Dear Mr. Lutchmediall;

I am submitting for your approval a work plan for the emergency clean up of asbestos containing dust from the elevator shaft at the above address. We propose the following;

1. Clean up will be performed by a licensed asbestos abatement contractor using NYC PEP and NYS DOL Certified Asbestos Handlers. 2. Work area will be defined as the roof entrance landing and elevator shaft 3. An airlock will be consitucted at the doorway to the elevator machine room in the basement and on the rooL 4. All electric will be supplied by the building and all extension cords will have ground fault

5. Oncetheafrlocksar cle wilibeginfdilowingcleanupprocedureainNYCThle 15, Chapter 1. 6. Critical barriers will be placed in the basement of the elevator shaft and on the skylight 7. Area air monitoring and OSHA monitoring will be performed during the clean up, 8. Upon achieving visual clearance on all floors of the elevator shaft TEM air sampling will be performed on each floor. 9. All removal and air monitoring will be performed in accordance with NYC Title 15, Chapter 1. 10. All clearance air sampling and waste manifests will be forwarded to the building owner upon completion. 11. An Emergency Notification will be sent to the NYC PEP within 24 hours of the start of the project. The Notification will be for the emergency clean up of 8,500 square feet of asbestos containing dust.

Very Truly Yours,

Timothy I. Donohoe Donohoe InWronmentaL Inc.

NYC-WTC 000129037

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000129037Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →