Chain of custody form for EMSL Analytical, Apr 2002

Machine-extracted title · confidence 50%

Chain of custody document from EMSL Analytical dated April 15-17, 2002 regarding sample analysis.

NYC-WTC_000104635–000104640

Folder label: “150 Franklin Street

Page image
Scanned page image, NYC-WTC_000104639
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document Fran: Tlm Donohoe 212673 7213 To:go*Baldwin Data 4118102 That: 12:06:14 PM Pe®e2of2 (

0 DONOHOE ENVIRONMENTAL, INC 39 Bowery #684 New York. New York 10002

Phone : 212 260-9818 Fax:212 673-7215

April 18, 2002

Ms. Carl Lutchmedial N.Y.C. D.S.P., Asbestos Control Prom 59 -17 Junction Blvd., 8th Floor Queens, -Y 11368-5107

Rrr Proposed Scope of Work in the elevator shaft, on the entrance landing and roof at 150 Franklin Street, NYC.

Dear Mr. Lutchmedial:

I am submitting for your approval a work plan for the emergency clears up of asbestos containing dust from the elevator shaft at the above address. We propose the following. 1. Clem up will be performed by a licensed asbestos abatement contractor using NYC DEP and NYS DOL Certified Asbestos Handlers. 2. Work area will be defined as the roof entrance landing and elevator shaft. 3. An airlock will be constructed at the doorway to the elevator machine room in the basement and on the root 4. All electric will be supplied by the building and alt extension cords will have ground fault interrupters. S. Once the air locks are set up, clean up will begin following clean up procedures in NYC Title 15, Chapter 1. 6 Critical barriers will be placed in the basement of the elevator shaft and on the skylight 7. Area air monitoring and OSHA monitoring will be performed during the clean up. 8. Upon achieving visual clearance on all floors of the elevator shaft TBM air sampling will be performed on each floor. 9. All removal and air monitoring will be performed in accordance with NYC Title 15, Chapter 1. 10. All clearance air sampling and waste manifests will be forwarded to the building owner upon completion. 11. An Emergency Notification will be sent to the NYC DEP within 24 hours of the start of the project. The Notification will be for the emergency clean up of 8,500 square feet of asbestos containing dust.

Very Truly Yours,

Timothy J. Donohoe Donohoe Environmertat inc.

NYC-WTC 000104639

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000104639Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →