Asbestos inspection report, 102-104 Greenwich Street

Machine-extracted title · confidence 95%

Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.

NYC-WTC_000128550–000128593

Folder label: “102 GREENWICH 1001054, 53/37”

Page image
Scanned page image, NYC-WTC_000128576
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

vi. Filler materials used to repair damaged and missing areas of asbestos material shall contain no asbestos, shall adhere -containing well to the substrate and shall provide an adequate base for the encapsulating agent. vii. Encapsulated asbestos-containing materials shall .be identified by signs, labels, color coding or some other mechanism to warn disturb the material that asbestos is present. persons who may be required to

viii. Where encapsulants are sprayed on asbestos-containing materials: 1. Low pressure airless spray shall be used. The airless spray gun shall have an appropriately sized tip which shall be tested by briefly spraying the encapsulant onto a surface from approximately 12 inches away. An appropriately sized tip will spray the encapsulant in a eight inches wide; it will also distribute the fan approximately fan, giving even coverage. encapsulant uniformly within the

2. A suitable quantity of HEPA filtration units shall be used during the • encapsulation process which shall have sufficient capacity to cause one complete air exchange every 30 minutes.

3. At least three coats of the encapsulant shall be applied to the surface of the asbestos-containing material. Each coat shall be applied in a two-step procedure. The first step is to apply a light mist loose fibers and keep them from breaking coat to moisten and seal any away from the surface. This mist coat should be applied in three or four quick 24 inches from the surface. After an area passes with the gun held 18 to of 16 to 20 square feet has been give the mist coat, a heavier coating is applied, using 8 to 10 passes with the gun held 10 to 12 inches from the material. The gun should be kept in constant motion to create a smooth and even coat. This two-step application shall be considered one coat of encapsulant. Each subsequent coat shall be applied at a 90 degree angle to the direction of the preceding coat application, to ensure complete coverage of the material. When questions rise regarding drying asbestos-containing or use under different weather conditions, time, curing time, dilution, the manufacturer's recommendations and instructions shall be consulted. 4. All other preparation, decontamination, and work procedures used in encapsulation projects shall be requirements and the same a those used in removal projects.

5. Sealants used in the encapsulation shall not alter the existing fire rating and shall be flame resistant and meet the flame spread and requirements of Federal, State and Local guidelines. smoke generation

NYC-WTC 000128576

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128576Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →