NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/123 FULTON STREET 1001265, 91/9
Document / 7 pages

WTC building inspection form, residential or commercial, Jun 2002

Machine-extracted title · confidence 92%

Inspection form documenting facade surveys and hazardous material assessments for a building near the World Trade Center site.

NYC-WTC_000127861–000127867

Folder label: “123 FULTON STREET 1001265, 91/9

Page image
Scanned page image, NYC-WTC_000127864
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 123 oor OOF ANI Zip FACADE Inspector Dennis Antzoulatos Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzex Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person FULTON STREET Borough 1 Building Type MIXED USE Block 91 Lot, Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: AS NOTED Squad # Badge # N/A A020 Photos Taken Tes) NO Address City State Zip Phone Time of Inspection from: As NOTED MONDAY JUNE 11, 2002 8:00AM WORKERS BEGIN ERECTING THE REMOTE DECON UNIT ON THE ROOF DF 119 FULTON STREET. THE DECON WHL BE USED FOR THE CUEAN-UP PROSECTS ON THE ROOF OE 119 FULTON, 121 FULTON AND 123 FULTON STREET. FOR THE PURPOSES OF ALR MONITORING (SAMPLING) THE ROOF AREAS OF THESE THREE BUILDINGS WILL BE TREATED AS ONE WORK AREA. THE AlR SAMPUNG WuL BE CONDUCTED BY FAYED EL GENDI CCERTIFICATE # ALl 01-1/631 EXP 03/03) OF WARDEN | PANZEE ENGINEERS. FIVE AIR SAMPLES WILL BE TAKEN. TUESDAY JUNE 18, 2002 WORK PROCEEDS AS PER THE APPROVED SCOPE OF WORK. AIR SAMPLING WHL BE PERFORMED DY FAYED EL GENDI OF WARREN I PANZER ENGINEERS. WEDNESDAY JUNE 19,2002 6:00PM THE ROOF CIEAN UP OF THIS PREMISE IS NOW COMPLETE, NO VISIBLE WTC DEBRIS WAS OBSERNED SUNDAY JUNE 23, 2002 6:00 pM WORKERS BEGIN THE FACADE CLEAN UP OF THE SOUTH FACADE CEULTON STRBET) THE FACADE OF 125 FULTON IS ALSO BEING DONE. FOR THE PURPOSES OF ALR MONITORING THE FACADES OF THESE TUO BUILDINGS ARE BEING TRCATED AS ONE WORK AREA. LARRY BAER PERFORMS AIR SAMPLING. 8:00 PM THE FACADE CIEAN-UR 1S NOU COMPUETE. I CONDUCT A VISUAL INSPECTION OF THE FACADE SURFACE AND OBSERUE NO VISIBLE WTC DEBRIS THE CLEANUA AT THIS PREMISE IS NOUS COMPLETE. NYC-WTC_000127864

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127864Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127836 · Box DEP Box 52

Legal agreement between the City of New York and a landowner regarding debris removal from exterior areas at 123 Fulton Street.

Filed in the same folder

NYC-WTC_000127837 · Box DEP Box 52

Laboratory report from ATC Associates detailing asbestos fiber analysis via transmission electron microscopy for samples from 125 Fulton Street.

Filed in the same folder

NYC-WTC_000127843 · Box DEP Box 52

Laboratory report from ATC Associates detailing asbestos fiber analysis via transmission electron microscopy for samples from 125 Fulton Street.

Filed in the same folder

Compare copies and versions →