Asbestos Project Notification Form

Machine-extracted title · confidence 90%

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

NYC-WTC_000127792–000127811

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127793
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

F- 6426206039 ASBESTOS INSPECTION REPORT (continued)

26. Asbestos Hauler DJM Co. Inc. NYS DEC Permit # NJ-344 Tel.# (973) 491-0006

C7 DisposalSite(s) Meadowfill Landfill, Bridgeport WV & Cumberland Landfill Shippberg, PA 27. This asbestos abatement is part of a ( Item a through a requires filing of this form with the NYC Department of Buildings)

a) ® Demolition b) ❑ Boiler Replacement Sprinkler Replacement c) ❑ d) ❑ Renovation/Alteration

e) ❑ Fireproofing Replacement f) Q Other (Describe) Asbestos Abatement/WTC Dust Remediation

28. TYPE OF ABATEMENT (Check all appropriate boxes)

g] Removal ❑ Enclosure ❑ Encapsulation ❑ Repair ❑ Clean up

29. ABATEMENT PROCEDURE (Check all appropriate boxes)

❑✓ Full Containment ❑ Glovebag ❑ Tent DEP Variance Application

30.LOCATIONS OF ABATEMENT SECTION OF FLOOR AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING Floor(s) CONTAINING ACM PERFORMED (e.g. entire, east wing, room #, (e.g. Pipe lagging, ceiling, plenum SQUARE LINEAR (e.g. running cable, installing fire sprinders, boiler room, lobby, etc.) ducts, storage tanks, decdn , etc. FEET FEET temong and readng boilers, sic) Bsmt-5 Entire WTC Dust 9,064 Sub-Chapter G

Bsmt Entire Pipe Insulation 32 Asbestos Abatement

1 Entire Pipe Insulation 15 Asbestos Abatement

2 Entire Pipe Insulation 10 Asbestos Abatement

Roof 1st Floor Roof Roof & Flashing 146 Asbestos Abatement

Roof 5th Floor Roof Roof, Flashing & Tar 525 Asbestos Abatement

1-5 Facade Window Caulk 10 Asbestos Abatement

fl 1-5 Facade WTC Dust 8,576 WTC "Bldg Ext. Cleanup"

Roof 5th Floor Roof Coping Stone Caulk 1 Asbestos Abatement

Additional pages attached ❑ 31. I hereby declare that the information povided herein Is true and complete to the best of my knowledge. I am familiar with Federal, State and NYC laws and regulations applicable to asbestos related work.

Airtek Environmental Hazardous Elinimation Airtek Environmental Print Name of Air Monitor Print Name of Asbestos Contractor Print Name of Applicant

Signature Signature Signature

Date Date Date

32. 1 understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos Control Program Rules. I have contracted the third party air monitor who is completely independent of all parties involved in the asbestos project. I hereby declare that I have authorized the filing of this notification for the work specified herein.

Greenwich Street Project, LLC. Print Name of Owner Signature Date

A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.

• Any modification of information provided on this form must be reported immediately In writing directly to the NYC DEP ACP. The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened through the performance of work in incremental or piecemeal fashion.

L NYC-WTC 000127793

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127793Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127779

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

30 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.992

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →