NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 51/131 DUANE STREET Block: 147 Lot: 2 BIN: 1001606
Document / 7 pages

Invoice for roof removal, Fiber Control Inc., Feb 2003

Machine-extracted title · confidence 95%

Invoice from Fiber Control Inc. for asphalt roof and facade removal services at 131-135 Duane Street.

NYC-WTC_000126159–000126165

Folder label: “131 DUANE STREET Block: 147 Lot: 2 BIN: 1001606

Page image
Scanned page image, NYC-WTC_000126160
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program K . 59-17 Junction Boulevard, 8" Floor. Corona. NY 11368-5107 eueding Dept. or TRu No FOR DFFCpµ USE Olt v TYPEWRITTEN FORMS WILL BE -r-'~•'"0 ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) LI

~P3~ When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original 'I signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. form must be submitted to the NYC DEP not less than one week in advance of the start of abatement This activities. 1. FACILITY

2. Address j I ii13 1) L1PcPi Z, ) E I Borough 1 ' 1 Zip JP 0 L3 AISA 3. Block 4. Lot L. 5. Type of Faclity S. Name of Building II. BUILDING OWNER

7. Name _J ~l 1 iZ 1 ZE D I - • 8. Contact Person 9. Tel.# Fax n 10. Address 5(, PGI> O UC M_ S 1 City _ !V ` State Zip d- -- Ill. GENERAL CONTRACTOR

11. Name Tel.* IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name BEE _ _._._._._._._._ 13. Contact Person _/c- ) fC~S~/~ 14. Federal Employer ID. # _PI I _ _ _ _ _ _ _ _ _115. Tel. # ! - 7~✓''3oa o Fax # 5I1 - ?c/ 3 ' 85 16. Address OLO/JS i4t cL) Ji194 State zip _117 3 V. THIRD PARTY Al MONITOR

' 17. Name Q$-t kit ZEe2 S r. IBS Pc 18. Contact Person ' 1C ~ r ~oLhr1- 19. Federal Employer ID. # 20. Tel. # a(a- 4aa- 0 O. Fax # 2.13 - C22 -OE, 3D ,r- H` 21. Address s2 9 g -E /K1 al r' Sit2FEr City `i' T72# State Zip 00 / 22. Sample Analysis Laboratory SG w4-r(-F!L {-,f7g t X-A '!,eI~Sv 23. NYS DOH ELAP # / f 1L 8d VI. PROJECT INFORMATION 24. Starting date for this portion of work ~- O7— Projected completion date

Asbestos work schedule ❑ Monday El Tuesday 0 Wednesday ❑ Thursday 0 Friday ❑ Saturday 0 Sunday

Shift from: D am 0 pm to ❑ am ❑ pm If other. specify Access to inspect the premises must be provided during the worts schedule indicated in this Rem. ié:/ 4?S) 25. Total amount of asbestos-containing material to be abated during this work

16 187 5 Square Feet, and/or Linear Feet Arm 7 Wl2001

NYC-WTC 000126160

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000126160Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →