NYC 9/11 Public Portal Document
12/11/2001 17:07 FAX 212 363 8306 ATC fj013
, f D 5755
APPENDIX
(Nonmandatory Information)
X1. DUST SAMPLE ANALYSIS
X1.! See Figs. X l . l and X l .2 for the dust analysis worksheet and the TEM count sheet.
DUST SAMPLE ANALYSIS
Client-. Accelerating Voltage:
Sample ID: Indicated Meg: POt
Job Number. Screen Meg: 1Ot
Date Sample Analyzed: - - Microscope: 1 2 3 4 5
Number of Openings/Grids Counted: Filter Type:
Grid Accepted, 600X: Yes No Filter Size:
Percent Loading: X Filter Pore Size (pm):
Grid Box #t: Grid Opening: 1) Pm x pm
2) Jim x PM
Analyft
Reviewer: Counting Rules: AHERA LEVEL It
Calculation Data:
Effective Filter Area in mm2: (EFA)
Number of Grid Openings Counted: (GO)
Avderage Grid Opening Area in mmi: (GOA)
Volume of sample Filtered in ml: M
Surface area Sampled in cmz: (SPL)
Number of Asbestos Structures Counted: (#STR)
• It the number of asbestos structures counted is less than or equal to 4. enter 4 structures as the limit of detection here.
FORMULA FOR CALCULATION OF ASBESTOS STRUCTURES "DUST' PER CM2:
EFAX X 100 X #STR _ (Asbestos structures per cmz)
GO X GOA X VX SPL
Results for Total Asbestos Structures`
(9wcttres per ems)
Results for Structur s > microns:
(Structures per cm3)
FIG. X1.1 Dust sample Anslyuls work Sheet
10
NYC-WTC 000125913
OCR can misread numbers and units. Confirm readings against the page image before using them.