NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 47/57 ANN ST BIN# 1001270 57 ANN STREET 1001270, 92/10
Document / 26 pages

Invoice for asbestos work, 57 Ann Street, November 2002

Machine-extracted title · confidence 98%

Invoice from Benjamin Kurzban & Son Control Inc. for asbestos removal work completed at 57 Ann Street in November 2002.

NYC-WTC_000119704–000119729

Folder label: “57 ANN ST BIN# 1001270 57 ANN STREET 1001270, 92/10

Page image
Scanned page image, NYC-WTC_000119719
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • : • Asbestos Inspection Report Block 92 Premise No. Floor Zip ROOF Inspector Dennis Antzoulatos 57 ANN STREET Borough Building Type PARKING GARAGE Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Inspection Date: 06-08-02 Lot Squad # Badge # 10 N/A Basis of Inspection WTC Survey Sample Number A020 Photos Taken YesNo N/A Sample Number N/A Sample Number N/A Owner's Name Address City 228 East 45 Street NY 10017 Contact Person New York Phone (212) 922-0077 State Zip Phone 93AM Time of Inspection from: WILLIS MOORE 930 AM - ,30 PM ARRIVED ONSITE. ABATEMENT CONTRAMTOR AND CONSULTANT REPRESENTATIVES ARE ONSITE. ABATENENT CONTRACTOR'S WORKERS ARE LOADING CFF EQUIPMENT TO BE USED IN THE CIEAN-UP OF THE GARAGE RCOF- ABATEMENT CONTRACTOR'S CRELO IS MADE UP OF 3 ASBESTOS HANDLEES 3 ASBESTOS HANDLER SUPERVISORS. I REQUEST PRESENTED WITH VALID NYC DEP AND NYS DOL LICENSESY FOR ALL CONSULTANT'S REP (WARDEN & PANZER), LARRY BAER ALSO PRESENTS HIS LICENSE (AH-8900814 EXP. DATE 02/03). ио са со о асте те оте енания 10°AM I SPOKE WітH DEPUTY DRECTOR P. THEODORELLUS REGARDING ArR SAMPUNE FOR THE PROJECT. ABATEMENT CONTRACTOR'S WORKERS BEGIN HANGING CAUTION TAPE AND DEBRIS ABATEMENT SIGNS AT ENTRANCES TO THE WORK AREA. 6. FRUCTMAN (NYC DEP) ARRÍVES ONSITE TO MONITOR AIR SAMPUNS:- 1°AM REMOTE DECONTAMINATION UNIT SET-UP BEGINS. 1225 PM ASBESTOS HANDLERS / SUPERUISORS BEGIN WETTING AND BAGGING BULK DEBRIS FROM THE ROOF. 12°PM-125 PM BAER (WARREN & PANZER) STARTS THE AIR SAMPLING FOR THIS PHASE OF THE ROOF CLEAN-UP (PHASE I). ROCF CUEAN-UP WIR BE DONE IN TUO PHASES. THE PHASE I AREA (13Ó'XSÓ ) IS THE AREA DIRECTLY OPPOSITE THE ELEVATOR DOORS. PHASE II AREA IS THE REMAINING ROOF AREA AND THE METAL FIRE ESCAPE. TODAYS ACTIVITIES WILL BE LIMITED TO PNASE I: A TOTAL OF FIVE AIR SAMPLES WiLL BE RUN. TWO AIR SAMPUES ARE SET UP ON THE ROOF JUST OUISIDE THE PHASE I ROOF CLEAN-UP. AREA. ONE ALR SAMPLE IS SET UP AT THE LOCATION OF THE GFI ELECTRICAL PANEL (INTERIDR STAIRWELL LEADING TO ROOF) Pl NYC-WTC_000119719

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000119719Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →