NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 47/56 48 Beaver Street BIN: 1078999
Document / 9 pages

Asbestos removal invoice, 48 Beaver St, Jun 2002

Machine-extracted title · confidence 90%

Invoice from Asbestos Removal Corp for roof cleanup and debris removal at 48 Beaver Street.

NYC-WTC_000118936–000118944

Folder label: “56 48 Beaver Street BIN: 1078999

Page image
Scanned page image, NYC-WTC_000118937
OCR text

OCR status: ocr · source: ours

% NYC 9/11 Public Portal Document ‘a CL a IV Petals . NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION CA” 6 ata Asbestos Control Program A eX Se Pp); 59-17 Junction Boulevard, 8" Floor, Corona, NY 11368-5107 ~ } ’ LY a , P >,” / ASBESTOS PROJECT NOTIFICATION FO, ig (ASBESTOS INSPECTION REPORT) C wew.aye.gaeldep ) When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCOEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activilies . |. FACILITY 2. Address 48 Beaver Street BorougManhattan 7,,10004 AKA 56 Beaver Street 3.Block._29 sg ty 7907 5. Type of Facility 6. Name of Building ll. BUILDING OWNER 7.Name_ Time Equities 8. Contact Person 9. Tel # 212-206-5694 Fax # 10. Address. City : State _- Zip Ill. GENERAL CONTRACTOR 11. Name . ___ Tel. # iV. ASBESTOS ABATEMENT CONTRACTOR 12.Name_Trio Asbestos Removal Corp. 43. Contact Person Chris Horan 14, Federal Employer {O. # Pil 15. Tel. #718-961-4100 Fax#_718-961-4103 16. Address__ 14-20 129th Street ciyCollege Point - state NY Zip 11356 V. THIRD PARTY AIR MONITOR 17.Name_Warren & Panzer Engineers, P.C. 18. Contact Person Michael Nolan 20. Tel. # 212-922-0077 cay 212-922-0630 19. Federal Employer !0. # 21. Address 228 East 45th Street city New York State NY Zip 10017 22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP #_ 11251 VI. PROJECT INFORMATION 24. Starting date for this portion of work 4 2 oo Projected completion date b Bo foc Asbestos work schedule BH Monday tuesday Dk wednesday W Thursday bet Friday Disaturday wi Sunday Shift from: C Fim (pm to g Clam Chm If other, specify Access fo inspect the premises must be provided during the work schedule indicated in this item... JUN 2 5 2002 a . . . DEP/BANHM 25. Total amount of asbestos-containing material to be abated during this work ey ae 3,250 . Square Feet, and/or Linear Feet NYC-WTC_000118937

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000118937Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →