TYPEWRITTEN ! ASBESTOS PROJECT NOTIFICATION
FORMS WILL BE (ASBESTOS INSPECTION REPORT) 1. C ti
ACCEPTED w• e"'' (She fee schedule)
When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original
signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This
form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities.
I. FACILITY
2. Address 43-45 BROAD STREET Borough Manhattan Zip
AKA 3. Block 4. Lot
5. Type of Facility --_-__----_ 6. Name of Building
II. BUILDING OWNER
7. Name 8. Contact Person V1 t ce Sr'/fe t r'
9. Tel. # Fax #
10. Address City State Zip
III. GENERAL CONTRACTOR
11 Tel. #
IV. ASBESTOS ABATEMENT CONTRACTOR
12. Name TRIO ASBESTOS REMOVAL CORP. mm _13. Contact Person STEVEN PARMIGIANI
PI I .!~
14. Federal Employer ID. # L~._.___ —_ _ 15. Tel. # (718) 961-4100 Fax # (718) 961-4103
16. Address 14-20 129 STREET® — — _— _—_ — City COLLEGE POINT _--__ State NY Zip 11356
V. THIRD PARTY AIR MONITOR
17. Name WARREN & PANZER ENGINEERS, P.C. 18. Contact Person MIKE NOLAN
19. Federal Employer ID. # 20. Tel. # (212)922-0077 Fax # 212 922-0630 __
21. Address 228 EAST 45 STREET —_ — —_,— City NAY_ State NY Zip 10017 -
22. Sample Analysis LaboratoryWARREN & PANZER ENGINEERS, P.C. 23. NYS DOH ELAP # 11251 —__T
VI. PROJECT INFORMATION
24. Starting date for this portion of work _ / 7fJ' ___ Projected completion date
Asbestos work schedule ❑✓ Monday O Tuesday 0 Wednesday ❑✓ Thursday 121 Friday 10 Saturday O Sunday
Shift from: 8:00
_____ ~✓ am ❑ pm to 8: —
00 am Q pm
If other, J '', 4,
specify ---_____-___-__-_---------------------_____--_—______ -_-_-_-_.
RECEIVED cr
Access to inspect the premises must be provided during the work schedule indicated in this item.
a',
NOV 18 2002
U
eua Au or ury
1
25. Total amount of asbestos-containing material to be abated during this work O,,na, c
Asarsros coarsot r
V
19,375 Square Feet, and/or __-^ -----0 Linear Feet repceiM