NYC 9/11 Public Portal Document
Inspection disclosed that the following sections were complied with: (Check all that apply)
1-51 Notifications, Reports, Plan 1-71 - Air Sampling and Monitoring 1-91 - Worker Protection
1-101 - Materials and Equipment 1-116 - Work Place Preparation 1-117 - Worker Decontamination System
i
1-118 - Waste Decontamination System 1-126 - Engineering Controls j 1-127 - Entry/Exit Procedures
J 1-129 - Maintenance of Barriers J 1-138 - Encapsulation i 1-139 - Enclosure
1-140 - Glovebag 1-141 - Tent L .J 1-137 - ACM Disturbance, RemoveL, Handling
1-146 -Preliminary Clean-up 1-147 - Final Clean-up
1 I Project not started . Inspection
revealed all ACM to be intact. New start date: % /
f[ Project ongoing, expected completion date:
I about: All surfaces, including abated surfaces are free of visible ACM and encapsulate
Follow up necessary on
RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS
ERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
NYC-WTC 000118465
OCR can misread numbers and units. Confirm readings against the page image before using them.