NYC 9/11 Public Portal Document
ASBESTOS INSPECTION REPORT (continued)
:
26. Asbestos Hauler AtC
_NYS DECPert#_1A-371_TEL#(631)924-5050
Disposal ste(e) Meadadfil|Rte#2 B0268 Bridgepoit WV
27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings)
a) L Demolition
b) • Boiler Replacement
e) • Fireproofing Replacement n • Other (Describe)
c) Sprinkler Replacement
d) Renovation/Alteration
28. TYPE OF ABATEMENT (Check all appropriate boxes)
U Removal
• Enclosure
• Encapsulation • Repair
• Clean up
29. ABATEMENT PROCEDURE (Check all appropriate. boxes)
• Full Containment •] Glovebag
• Tent
• DEP Variance Application
30. LOCATIONS OF ABATEMENT
DESCRIBE SECTION
Floor(s)
OF FLOOR
(e.g. enlire, east wing, room #.
boiler room, lobby, elc)
AFFECTED SURFACES
CONTAINING ACM
(e.g. Pipe lagging, celling, plenum
ducts, storage tanks, decking, elc.)_
Roof
Item No. 3
Nalls
Item No. 7
FacadeItem No. 7
AMOUNT OF ACM
SQUARE
FEET
LINEAR
FEET
9850
5160
500
TAU0807ANOZ
DESCRIPTION OF WORK BEING
PERFORMED
(e.g. running cable, installing fire sprinklers,
removing and replacing bollers, elc.)
1. I hereby declare that the informationprovided herein is true and complete to the best of my knowiedge. Iam familiar with Federal.
State and NYC laws and regulations applicable to asbestos related work.
WarIen
Panzer
Print Nam of Air Monitor
1x10 Asbesto
coIp:
Nargeg! Asbesos Contract
Removal
NYC
Print Name of Applicant (If other than Owner)
signature
6-4-42
Signature
Signature
Date
Date
Date
I understand that as the owner of a building where asbestos abatement activity occurs, 1 am responsibie for the performance of
the asbestos abatement activities in accordance with the Asbestos Control Program Rules. I have contracted the third party air
filing of this notification for the work specified herein.
h1 Midtown Property c/o NYC
Print Name of Owner
Signature
A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.
Any modification of information provided on this form mustbe reported immediately in writing directly to the NYC DEP ACP.
The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened
through the performance of work in incremental or piecemeal fashion.
ACPT
2/2001
NYC-WTC_000118065
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000118065Source: NYC Law Department, mirrored locally