Document / 13 pages

License agreement, 211 Pearl Street, Aug 2002

Machine-extracted title · confidence 95%

Agreement between the City of New York and a landowner for the removal of foreign debris from exterior areas of 211 Pearl Street.

NYC-WTC_000115317–000115329

Folder label: “211 PEARL STREET 1001120, 69/6

Page image
Scanned page image, NYC-WTC_000115318
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

orn,R N, NYC DEPARTMENT. OF ENVIRONMENTAL PROTECTION Asbestos Control Program

; t•P : ASBESTOS PROJECT NOTIFICATION 59-17 Junction Boulevard, 8"' Floor, Corona. NY 11368-5107

ILL BE (ASBESTOS INSPECTION REPORT) Ig , w ww.nc.~rorreer PTED with original When submitting this form at the NYC Department of Buildings, the original form and three (3) copies signatures. This signatures are required. Submittal at the NYCDEP requires one copy of the form with original abatement activities. form must be submitted to the NYC DEP not less than one week in advance of the start of

1. FACILITY S , e~~z Borough MAM Zip 10038 2. Address 2 u PEARL _ _ 3. Block 69 4. Lot 6 AKA —

5. Type of Facility 6. Name of Building

II. BUILDING OWNER

7. Name _ 8. Contact Person

9. Tel. # Fax # ______ City ------- State ______ Zip — 10. Address _—

Ill. GENERAL CONTRACTOR —_ ______ Tel. # _ 11. Name rN

IV. ASBESTOS ABATEMENT CONTRACTOR 1asr~ttic.► kcicxt3~ts Soli ~ ~ t14C 13. Contact Person ou ig I 3b t Cu 12. Name [_15. Tel. # _CttL~1 53i-29co —Fax#_ t1 C l2____ 14. Federal Employer ID. # P11

16. Address {24$ — ~..>~ v Nuc _—_ — City __— o L __--_ State uY _ Zip i123b _

V. THIRD PARTY AIR MONITOR 9Ao e E t t~s _ 18. Contact Person Ji i± 13cs __— 17. Name u%Qa PII 20.Tei.# C2ta) 922-00 Fax # (212) 922-c=30 19. Federal Employer iD. # -- — ?~~ t~1 4S'M SST City N-- YoPx 1~u __ State _'L. Zip COi7 21. Address 23. NYS DOH ELAP # 22. Sample Analysis Laboratory___________________________

VI. PROJECT INFORMATION 24. Starting date for this portion of work _.2!i to 1 ° z Projected completion date

I ] Saturday ® Sunday Asbestos work schedule ® Monday ® Tuesday ® Wednesday ® Thursday ® Friday

Shift from: 8 © am ❑ pm to ❑ am In pm $ a

If other, specify — —___ — ____— __— _ ' r i i 4'lfl h Q A/-h ir~ i / Access to inspect the premises must be provided during the work schedule indicated in this item.

25. Total amount of asbestos-containing material to be abated during this work 1022 __ Square Feet, and/or b Linear Feet `: \. 4 ACP 2W

.. :r•Riw

NYC-WTC 000115318

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000115318Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →