NYC 9/11 Public Portal Document
V rxr-R
em NYC DEPART ic F ENVIRONMENTAL PROTECTION
Asbestos Control Program
59-17 Junction Boulevard. 8r' Floor, Corona, NY 11368-5107
> Wilding Dept. or TRU No
ONL'Y 1~ FOR OFFICIAL USE ONLY
(I ,
TYPi"ITTEN ASBESTOS PROJECT NOTIFICATION
(ASBESTOS INSPECTION REPORT) 1.
..~• , yc.:n.::.►
"ACCEPTED
Vt
When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original
signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This
form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities .
I. FACILITY
2. Address 52 WIILIAM STREET Borough Manhattan Zip—.
AKA 47-49 PINE STREET, CLUB QUARTERS 3. Block 4. Lot
5. Type of Facility__—____ _—__—_—__ ___ 6. Name of Building
II. BUILDING OWNER
7. Name FINANCIAL DISTRICT ASSOCIATES LLC do MAST 8. Contact Person
212 626-9392
9. Tel. # ----------- - Fax # —_—__—__—__
----- _______
10. Address ------------------------------ City --------------------- State ----- Zip ---------
III. GENERAL CONTRACTOR
11 _ Name Tel. #
IV. ASBESTOS ABATEMENT CONTRACTOR
12. Name TRIO ASBESTOS CORP.
REMOVAL--------------------- STEVEN PARMIGIANI
13. Contact Person -----------------
-------------
14. Federal Employer ID. # L___- __ ____—__ 15. Tel. # (718) 961 _1 _______._ Fax # 718 961-4103
--------------
16. Address 14-20 129 STREET - City COLLEGE POINT —_- State NY - zip 11356 _—
V. THIRD PARTY AIR MONITOR
17. Name WARREN & PANZER ENGINEERS, P. C._- -_----_- - _ - 18. Contact Person MIKE NOLAN
19. Federal Employer ID. # _____ ______ 20. Tel. # (212) 922----- --_-- Fax # (212) 922-0630 --
21. Address 228 EAST 45ty STREET —_ ---__-- City N_Y___-__--_ —_ —__ State NY-- Zip 10017
22. Sample Analysis LaboratoryWARREN & PANZER ENGINEERS_ P _C._____-- 23. NYS DOH ELAP # 111251
VI. PROJECT INFORMATION
24. Starting date for this portion of work _ _ L0 Z Projected completion date _— /L.2..JI
I
)
Asbestos work schedule 0 Monday 0 Tuesday 9 Wednesday 0 Thursday 0 Friday 0 Satulday-QSunday
Shift from: 8:00 __ ❑✓ am 0 pm to $_~~ 0 am 0 pm In
If other,
specify
Access to inspect the premises must be provided during the work schedule indicated in this item.
1
25. Total amount of asbestos-containing material to be abated during this work
__ 3,940 Square Feet, and/or —_—_—_ 0 Linear Feet
ACP 7
2/2001
NYC-WTC 000111376