NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/Zone I Copies
Document / 12 pages

Asbestos Project Amendment form, Oct 2001

Machine-extracted title · confidence 90%

NYC DEP Asbestos Project Amendment form for modifying a previously filed abatement date.

NYC-WTC_000111334–000111345

Folder label: “Zone I Copies

Page image
Scanned page image, NYC-WTC_000111344
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document r , pj.Cin Otis NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION ~/ J I, l,V + •° ' ~"~ Asbestos Control Program 59-17 Junction Boulevard. 8'" Floor. Corona, , t07 i,Voo

DP • Building Dept. or TRU No FOR OFFICA1. USE ONLY ~N N ASBESTOS PROJECT NOTIFICATION WILL BE (ASBESTOS INSPECTION REPORT) EPTED _~•n~e:e.Iler . 1. schedule)

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original . signatures are required. Submittal at the NYCOEP requires one copy of the form with original signatures. This form must be submitted to the NYC OEP not less than one week in advance of the start of abatement activities,

I. FACILITY .

2. Address LO 2 }} t{ Q,t=(4 — I (ZT ( Borough Zip _ —S'( r ~ f AKA 1 _ 3. Block - ~-7l 4. Lot

5. Type of Facility—, 6. Name of Building II. BUILDING OWNER

Name 2a _CL I S1' 9C I Ai £S W-l8. Contact Person

9. Tel. # Fax

10. Address _ L I+ Tape'. =t_ __ City -- ---_ State N _J Zip O C

Ill. GENERAL CONTRACTOR

11. Name ----_ Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name (e1~ ~'UL_ ___ ------ 13. Contact Person

14. Federal Employer I0. # -----. 15. Tel. # J 16 - 1 0 Fax #

16. Address city —_ l Li7 `Z—_ State /v _ Zip _LL2 _

V. THIRD PARTY AIR MONITOR

17. Name y L _L 4_t 18. Contact Person ' 1 t L 1 I"

19. Federal Employer ID. # --------------- __ 20. Tel. 1 _QJ =04 — Fax #

21. Address City _t ~Y`~ _( 2 State l Zip _ 22 ( - 4 -- 22. Sample Analysis Laboratory—_ _~ ( ( <<-~^ ~~ `7-'/eS v 23. NYS DOH ELAP #

VI. PROJECT INFORMATION 24.. Starting date for this portion of work _Lf_ Projected completion date

Asbestos work schedule ❑ Monday ❑ Tuesday ❑ Wednesday ❑ Thursday 0 Friday 0 Saturday 0 Sunday

0 Shift from: ❑ am 0 pm to 0 am 0 pm

If other, specify ----------- -- -------- --------- ;` ~+EV Access to inspect the premises must be provided during the work schedule indicated in this item. 1 ,

25. Total amount of asbestos-containing material to be abated during this work

;-irR-1_ — Square Feet, and/or _—_ Linear Feet ACP _ 2R0' ex:aai~7a~ -rc lye "f.j^ r:al3Gl Fn I.",

NYC-WTC 000111344

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111344Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →