NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/Zone III Copies
Document / 3 pages

Asbestos project notification and inspection report form

Machine-extracted title · confidence 85%

NYC DEP form for asbestos project notification requiring submission to Department of Buildings and DEP with original signatures and copies.

NYC-WTC_000111220–000111222

Folder label: “Zone III Copies

Page image
Scanned page image, NYC-WTC_000111220
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

A. -- „ ~ 4\ NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION

D^ p \9 Asbestos Control Program 59-17 Junction Boulevard, 8 „ Floor. Corona. NY 11368-5107 Building Dept. or TRU No ONLY FOR OFFICUL USE ONLY TPEWRIT.TEN / I ASBESTOS PROJECT NOTIFICATION FORMS WILL BE (ASBESTOS INSPECTION REPORT) ACCEPTED i •••.•.c.r•i••fl 1. IS" IAA tt #1 AAl

When submitting this form at the NYC Depe signatures are required. Submittal at the P form must be submitted to the NYC DEP not

I. FACILITY

2. Address 48 Beaver Street AKA

5. Type of Facility II. BUILDING OWNER

7. Name 56 Beaver Street

Time Equities ct ' cç 2J')2 9. Tel. # 212-206-5694 10. Address Fax# __ M ra

Ill. GENERAL CONTRACTOR

11. Name_ _ Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR

12.Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan

14. Federal EmployerlD.#______P-~______ 15. Tel.#718-961-4100 Fax# 718-961-4103 16.Address_ 14-20 129th Street CityCollege Point State NY Zip 11 356 V. THIRD PARTY AIR MONITOR

17:Name Warren & Panzer Engineers, P.C. 18. Contact Person Michael Nolan

19. Federal Employer ID. # 20. Tel. # 21 2-922-0077 Fax# 21 2-922-0630 21.Address228 East 45th Street City New York State NY Zip 10017 22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP # 1 1 251' VI. PROJECT INFORMATION 24. Starting date for this portion of work Projected completion date

Asbestos work schedule ❑ Monday ❑ Tuesday ❑ Wednesday ❑ Thursday ❑ Friday ❑ Saturday ❑ Sunday

Shift from: ______Dam ❑pm to Dam ❑pm

If other, specify _

Access to inspect the premises must be provided during the work schedule indicated in this item.

25. Total amount of asbestos-containing material to be abated during this work

.....3..,,_250 _ Square Feet, andlor _ Linear Feet 7 )1

NYC-WTC 000111220

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111220Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →