December 6, 2001
Mr. Rajappan Radhakrishnan,
'1 CONTRACTING, INC.
0
DC
Director
NYC Department Of Environmental Protection
Bureau Of Air, Noise And Hazardous Materials
Asbestos And Lead Control Program W
59-17 Junction Blvd. - 8th Floor
Corona, NY 11368-5707 I—
H
Re: 3 World Financial Center, 1", 2"d, Mezzanine, 3rd Floor Areas
N
ETS Contracting, Inc.
Method Of Procedure (Narrative Overview) — Emergency Debris Clean - Up
Install GFI Electric Panel And Run Water Hoses.
Erect Decontamination Facility Install Negative Air Filtration HEPA Units
(attached to work
areas).
0'
Install Containment Polyethylene Protection Of Critical Barriers Only (as per J
protocol letter).
Perform Gross Removal Operations Of ACM Debris for Designated Areas 0
Caused By World
Trade Center Attack. Z
Perform Fine Cleaning Operations And Air Test For Each Work Area. = I
V
Final Air Samples By Independent Air Monitor (ELAP Accredited). •
LU
Breakdown the Critical Barriers and Decon. Facilities.
I—
Demobilize From The Site
J
*
All Aspects Of The NYC-DEP World Trade Center Emergency
Procedures letter (9/26/0 1) will be
adhered to.
* There is no pre-existing ACM within the building. I—
Sin rely,
E Contract' g, Inc.
ZI
LU
obert Middleton
Sr. Project Executive
RM/mc
ZI
0
var'3 W FC
160 CLAY STREET
BROOKLYN, NY 11222
TEL. (718) 706-6300
FAX. (718) 706-1032
Z II
E-r.+AIL:
[email protected]
W
NYC-WTC 000110958
OCR can misread numbers and units. Confirm readings against the page image before using them.