ASBESTOS INSPECTION REPORT (continued)
26. Asbestos Hauler Tri-State Transfer NYS DEC Permit # 1A-375 Tel.# 718-617-0771
Disposal Site(s) Meadowfill Landfill, Rt. 2, Box 68, Bridgeport, WV & Greenridge Recalm., Rd. 1, Scottdale, PA__
27. This asbestos abatement is part of a (Item a through e requires filing of
this form with NYC Department of Buildings)
a) ❑ Demolition b) 0 Boiler Replacement c) 0 Sprinkler Replacement d) 0 Renovation/Alteration
e) 0 Fireproofing Replacement f) ❑✓ Other (Describe) ACM Removal Only
28. TYPE OF ABATEMENT (Check all appropriate boxes)
2 Removal 0 Enclosure 0 Encapsulation 0 Repair El Clean up
29. ABATEMENT PROCEDURE (Check all appropriate boxes)
El Full Containment 0 Glovebag 0 Tent 0 DEP Variance Application '(I3Ht)
30. LOCATIONS OF ABATEMENT
DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM
Floor(s) OF FLOOR DESCRIPTION OF WORK BEING
CONTAINING ACM PERFORMED
(e.g. entire, east wing, room li, (e.g. Pipe lagging, ceiling, plenum SQUARE LINEAR
boiler room, lobby, etc) (e.g. running cable, installing fire sprinklers,
ducts, storage tanks, decking, etc.) FEET FEET removing and replacing boilers. etc.)
1st S.E. Corner Debris Clean -Up 1,300 ACM Debris Clean - Up
2nd S.E. Corner Debris Clean -Up 4,000 ACM Debris Clean - Up
Mezzan. S.E. Corner Debirs Clean - Up 4,000 ACM Debris Clean - Up
3rd Training Room Debris Clean - Up 1,200 ACM Debris Clean - Up
3rd AC Unit, AC 2C Debris Clean -Up 800 ACM Debris Clean - Up
Note: Above areas to be abated as per World Trade
Center Protocol Letter of Work Procedures
For Debris Clean Up.
31. I hereby declare that the information provided herein is true and
complete to the best of my knowledge. I am familiar with Federal,
State and NYC laws and regulations applicable to asbestos related work.
A ient Gro , Inc Contracting Inc. ETS C ntr cting n .
______________________
j Print ne f nitor meo Os Co Pri a of Ap (If other than Owner)
S' natu Signature Signature
12/5/01 12/5/01 _ _— 12/5/01
Date Date Oate
32.I understand that as the owner of a building where asbestos abatement
activity occurs, I am responsible for the performance of
the asbestos abatement activities in accordance with the Asbestos Control
Program Rules. I have contracted the third party air
monitor who is completely independent of all parties involved in the asbestos
filing of this notification for the work specified herein. project. I reby declare that I have authorized the
_
American Express Co. -^__ _ _ _ _ 12/5/01
Print Name of Owner Sig ature Date
(as agent for owner) l
A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.
Any modification of information provided on this form must be reported immediately
in writing directly to the NYC DEP ACP.
The requirements of the Asbestos Control Program Rules may not be lawfully
avoided or lessened
through the performance of work in incremental or niecemeal fachinn
ACP7
212001
NYC-WTC 000110955
OCR can misread numbers and units. Confirm readings against the page image before using them.