NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/164 WILLIAM STREET; 1001282, 93/24
Document / 18 pages

164 WILLIAM STREET; 1001282, 93/24

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000110912–000110929
Page image
Scanned page image, NYC-WTC_000110913
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION . 59-17 Junction Boulevard, 8" Floor, Corona, NY 11368-5107 STRONG Building Dept. ASBESTOS PROJECT NOTIFICATION _TOROPFICINL USE ONLY (ASBESTOS INSPECTION REPORT) 1. ” 40. DEY (Sée fee schedule) When subm Feiner at the NYC Department of Bultinge, the original form and three (3) coples with original signatures are ene Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submited to the NYC DEP not less than one week in advance of the start of akatane ease. l. FACILITY 2. Address 164 William St Borough Manhattan Zip_ l003& AKA 3. Block 93 4.Lot _24 5. Type of Facility 6. Name of Building il. BUILDING OWNER 7. Name Polito Salvatore 8. Contact Person 9. Tel. # Fax # 10. Address City State Zip itl. GENERAL CONTRACTOR 11. Name ’ Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name Benjamin Kurzban & Son Control 13. Contact Person Louie tannico 14. Federal Employer ID. # Pil | 48. Tet. # (718) 531-2900 Fax # (718) 209-1808 16. Address _1248 Ralph Avenue City Brooklyn State NY ip _11236 V. THIRD PARTY AIR MONITOR 17. Name Warren Panzer ENG INEERS 18. Contact Person MICHAEL Notan 19. Federal Employer ID. # Pil |. 20. Tet. # (212) 922-0077 Fax # (212) 922-0630 21. Address 228 East 45th St City New york State NY zip _10017 22. Sample Analysis Laboratory 23. NYS DOH ELAP # VL PROJECT INFORMATION 24. Starting date for this portion of work _tolzeloz. Projected completion date _'l loeloz Asbestos work schedule Bl Monday (8 Tuesday Ei] wednesday El Thureday BU Friday £2 satu ay B Shift from:__ © __ am Ol pm to _8s_ O am Gd pm If other, specify Access fo Inspect the premises must be provided during the work schedule indicated in this Kam. 25. Total amount of asbestos-containing material to be abated during this work 6 55 square Feet, and/or © Linear Feet NYC-WTC_000110913

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000110913Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →